Orange County NC Website
0 <br />2 Mattress Factory Road Interchange: Construct a new interchange at the existing grade - <br />separated crossing of Mattress Factory Road and 1- 40/1 -85. <br />This project was previously submitted by the City of Mebane for prioritization as a Highway <br />Mobility project and will be submitted by Orange County for reprioritization and consideration <br />for inclusion the BGMPO MTIP and 2016 -2022 STIP. <br />3 Mattress Factory Road Extension to U.S. 70: Extend Mattress Factory Road northward across <br />East Washington Street and the NCRR/Norfo/k Southern railroad right -of -way to intersect U.S. <br />70 and close the existing railroad crossover road connecting East Washington Street and U.S. <br />70 approximately 240 feet to the east of the intersection of Mattress Factory Road and East <br />Washington Street. <br />This project will be submitted as a new highway project to be considered for inclusion in the <br />BGMPO LRTP and MTIP as well as the 2016 -2022 STIP. <br />4 Park - and -Ride Lot in the Buckhorn Economic Development District (EDD) /Mebane area: <br />Construct a park- and -ride facility to be located in the Buckhorn EDD /Mebane area to serve a <br />cross - county bus route from Mebane to Durham to collect ridership in eastern Alamance and <br />western Orange Counties as indicated in the Orange County Bus and Rail Investment Plan <br />(OCBRIP). <br />This project will be submitted as a new transit project for consideration of inclusion in the <br />BGMPO LRTP and MTIP as well as the 2016 -2022 STIP. The project was previously <br />submitted through the Durham - Chapel Hill - Carrboro (DCHC) MPO as a park- and -ride facility <br />to be specifically located in the Buckhorn EDD. <br />5 Buckhorn Road (SR 1114) Widening: Widen Buckhorn Road from U.S. 70 to West Ten Road <br />(SR1144) to multiple lanes with bicycle and pedestrian facilities. <br />This project was previously submitted as a highway project and will be reprioritized and <br />submitted as a highway project for consideration of inclusion in the BGMPO LRTP and MTIP <br />as well as the 2016 -2022 STIP. <br />6 Lebanon Road bicycle and pedestrian improvements: Construct four (4) -foot bicycle lanes <br />from N. Frazier Road to Stagecoach Road with pedestrian /sidewalk facilities from Saddle Club <br />Road to Stagecoach Road. <br />This project will be submitted as a new highway project for consideration of inclusion in the <br />BGMPO LRTP and MTIP as well as the 2016 -2022 STIP. <br />Upon motion of Commissioner , seconded by Commissioner <br />the foregoing resolution was adopted this the 17`h day of September, 2013. <br />I, Donna Baker, Clerk to the Board of Commissioners for the County of Orange, North Carolina, DO <br />HEREBY CERTIFY that the foregoing is a true copy of so much of the proceedings of said Board at a <br />meeting held on September 17, 2013, as relates in any way to the adoption of the foregoing and that <br />said proceedings are recorded in the minutes of said Board. <br />WITNESS my hand and the seal of said County, this day of 12013. <br />Clerk to the Board of Commissioners <br />