Browse
Search
Agenda - 09-17-2013 - 5h
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 09-17-2013 - Regular Mtg.
>
Agenda - 09-17-2013 - 5h
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2013 12:09:02 PM
Creation date
9/13/2013 12:08:41 PM
Metadata
Fields
Template:
BOCC
Date
9/17/2013
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
5h
Document Relationships
Minutes 09-17-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16 <br /> SIGNAGE <br /> The County shall provide and maintain adequate signage and other warning devices for the <br /> protection of the public in accordance with the approved traffic control plans for the Project and <br /> the current edition of the Manual on Uniform Traffic Control Devices (MUTCD)for Streets and <br /> Highways, or any subsequent revision of the same, published by the Federal Highway <br /> Administration and effective at the time of award of the contract. <br /> SITE LAYOUT <br /> The County shall be responsible for ensuring that all site layout, construction work, and Project <br /> documentation are in compliance with applicable city, state and federal permits, guidelines, and <br /> regulations, including American Association of State Highway and Transportation Officials <br /> (AASHTO)guidelines and American with Disabilities Act(ADA)Standards for Accessible Design <br /> (www.usdoi.gov/crtlada/stdspdf,htm). <br /> CONSTRUCTION ENGINEEERING,SAMPLING,TESTING <br /> The County, and/or its agent, shall perform the construction engineering, sampling and testing <br /> required during construction of the Project, in accordance with Departmental procedures, <br /> including the Department's Guide for Process Control and Acceptance Sampling and Testing. <br /> The County shall document that said compliance was accomplished in accordance with State and <br /> Federal procedures, guidelines,standards and specifications. <br /> RIGHT TO INSPECT <br /> The Department and representatives of the Federal Highway Administration shall have the right to <br /> inspect, sample or test, and approve or reject, any portion of the work being performed by the <br /> County or the County's contractor to ensure compliance with the provisions of this Agreement. <br /> Prior to any payment by the Department, any deficiencies inconsistent with approved plans and <br /> specifications found during an inspection must be corrected <br /> CONTRACTOR COMPLIANCE <br /> The County will be responsible for ensuring that the contractor complies with all of the terms of <br /> the contract and any instructions issued by the Department or FHWA as a result of any review or <br /> inspection made by said representatives. <br /> Agreement ID# 149 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.