Browse
Search
Agenda - 09-17-2013 - 5h
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 09-17-2013 - Regular Mtg.
>
Agenda - 09-17-2013 - 5h
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2013 12:09:02 PM
Creation date
9/13/2013 12:08:41 PM
Metadata
Fields
Template:
BOCC
Date
9/17/2013
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
5h
Document Relationships
Minutes 09-17-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br /> ■ The County shall be responsible for designing an erosion control plan if required by the <br /> North Carolina Sedimentation Pollution Control Act of 1973, North Carolina General <br /> Statute 113A,Article 4, incorporated in this Agreement by reference at <br /> www.ncleg.net/gascrii)ts/Statutes/Statutes.asi and obtaining those permits required <br /> thereby in order to construct the Project. During the construction of the improvements, <br /> the County, and its contractors and agents, shall be solely responsible for compliance <br /> with the provisions of said Act and the plan adopted in compliance therewith. <br /> 10.RIGHT OF WAY/ UTILITY AUTHORIZATION <br /> If the costs of right of way acquisition or utility relocation are an eligible expense,the County shall <br /> submit a letter of request to the Department to authorize and set up right of way and/or utility <br /> funding. The acquisition for right of way,construction easements, and/or utility relocation may be <br /> undertaken only after the County receives written authorization from the Department to proceed. <br /> 11.PROJECT LIMITS AND RIGHT OF WAY (ROW) <br /> SPONSOR PROVIDE ROW <br /> The County, at no liability whatsoever to the Department, shall be responsible for providing and/or <br /> acquiring any required right of way and/or easements for the Project. <br /> TIME FRAME FOR ROW ACTIVITY <br /> The County will accomplish all ROW activities,to include certification of ROW,within 6 months of <br /> execution of this Agreement. <br /> RIGHT OF WAY GUIDANCE <br /> The County shall accomplish all right of way (ROW)activities, including acquisition and <br /> relocation, in accordance with the following: Federal Aid Policy Guide,Title 23 of the Code of <br /> Federal Regulations, Part 710, Subpart 13, and Title 49 of the Code of Federal Regulations, Part <br /> 24, [Uniform Act] incorporated by reference at www.fhwa.dot ov/le sre s/directives/fa toc.ht ; <br /> North Carolina General Statutes,Chapter 133,Article 2, Sections 133-5 through 133-18, <br /> Relocation Assistance, incorporated by reference at <br /> Agreement ID# 149 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.