1 <br />ORANGE COUNTY <br />BOARD OF COMMISSIONERS <br />ACTION AGENDA ITEM ABSTRACT <br />Meeting Date: September 12, 2013 <br />Action Agenda <br />Item No. 3 <br />SUBJECT: Whitted Meeting Room Schematic Design Review <br />DEPARTMENT: Asset Management Services PUBLIC HEARING: (Y /N) No <br />ATTACHMENT(S): INFORMATION CONTACT: <br />Schematic Floor Plans Jeff Thompson, (919) 245 -2658 <br />PURPOSE: To review and comment on the schematic design of the Whitted Permanent <br />meeting room, including meeting set -up and operational considerations, and provide guidance <br />to the Manager for the preparation of design documents for the facility. <br />BACKGROUND: On April 4, 2013, the BOCC authorized staff to move forward with the design <br />of permanent Board meeting facilities within the Whitted 2nd Floor "A" building in Hillsborough, <br />and included this capital project within the adopted Capital Investment Plan in FY 2013 -14. <br />On June 18, 2013, the BOCC authorized the Manager to move forward with the design, award a <br />bid, and complete the necessary site work for this project as "Phase 1" in order that the work <br />could be completed this fall during optimal outdoor weather. This site work, which will include <br />significant paving, stormwater management, lighting, pedestrian access, handicapped access, <br />and landscaping improvements, is currently out to bid and should be complete no later than the <br />end of November 2013. <br />The County has engaged Corley, Redfoot Architects as the designer for the project. Ken <br />Redfoot with Corley, Redfoot Architects ( "CRA ") will present the major elements of the <br />schematic design and lead a discussion with the BOCC on important operational issues (Dais <br />design, meeting setup, audio visual elements, meeting flow, etc.). <br />CRA will incorporate these comments into its full schematic design presentation to the BOCC <br />as a decision item at the September 17, 2013 regular meeting. The BOCC will be asked to <br />provide additional comment and allow the Manager to move forward with the preparation of <br />construction drawings for the facility. <br />