Browse
Search
Agenda - 09-12-2013 - 3
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 09-12-2013 - Work Session
>
Agenda - 09-12-2013 - 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2015 3:00:16 PM
Creation date
9/6/2013 4:16:31 PM
Metadata
Fields
Template:
BOCC
Date
9/12/2013
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
3
Document Relationships
Minutes 09-12-2013
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />ORANGE COUNTY <br />BOARD OF COMMISSIONERS <br />ACTION AGENDA ITEM ABSTRACT <br />Meeting Date: September 12, 2013 <br />Action Agenda <br />Item No. 3 <br />SUBJECT: Whitted Meeting Room Schematic Design Review <br />DEPARTMENT: Asset Management Services PUBLIC HEARING: (Y /N) No <br />ATTACHMENT(S): INFORMATION CONTACT: <br />Schematic Floor Plans Jeff Thompson, (919) 245 -2658 <br />PURPOSE: To review and comment on the schematic design of the Whitted Permanent <br />meeting room, including meeting set -up and operational considerations, and provide guidance <br />to the Manager for the preparation of design documents for the facility. <br />BACKGROUND: On April 4, 2013, the BOCC authorized staff to move forward with the design <br />of permanent Board meeting facilities within the Whitted 2nd Floor "A" building in Hillsborough, <br />and included this capital project within the adopted Capital Investment Plan in FY 2013 -14. <br />On June 18, 2013, the BOCC authorized the Manager to move forward with the design, award a <br />bid, and complete the necessary site work for this project as "Phase 1" in order that the work <br />could be completed this fall during optimal outdoor weather. This site work, which will include <br />significant paving, stormwater management, lighting, pedestrian access, handicapped access, <br />and landscaping improvements, is currently out to bid and should be complete no later than the <br />end of November 2013. <br />The County has engaged Corley, Redfoot Architects as the designer for the project. Ken <br />Redfoot with Corley, Redfoot Architects ( "CRA ") will present the major elements of the <br />schematic design and lead a discussion with the BOCC on important operational issues (Dais <br />design, meeting setup, audio visual elements, meeting flow, etc.). <br />CRA will incorporate these comments into its full schematic design presentation to the BOCC <br />as a decision item at the September 17, 2013 regular meeting. The BOCC will be asked to <br />provide additional comment and allow the Manager to move forward with the preparation of <br />construction drawings for the facility. <br />
The URL can be used to link to this page
Your browser does not support the video tag.