Browse
Search
2013-379 AMS - Gonzalez Painters & Contractors, LLC Painting & Carpentry Work F Battle Courtroom/New Courthouse
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2013
>
2013-379 AMS - Gonzalez Painters & Contractors, LLC Painting & Carpentry Work F Battle Courtroom/New Courthouse
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2013 9:07:32 AM
Creation date
9/6/2013 3:36:26 PM
Metadata
Fields
Template:
BOCC
Date
9/5/2013
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Mgr Signed
Document Relationships
R 2013-379 AMS-Gonzalez Painters & Contractors, LLC Painting & Carpentry Work F Battle Courtroom/New Courthouse
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-AdEFLA. <br /> Painters, ontracors. <br /> GONZALEZ PAINTERS & CONTRACTORS, LLC <br /> 3518 Guess Rd. <br /> Durham, NC 27705 <br /> P: 919-477-6058 <br /> www.fgpainting.com ESTIMATE <br /> Bill to: <br /> ORANGE COUNTY Date: Estimate #: <br /> Wayne Fenton <br /> P.O BOX 8181 8/20/2013 8554 <br /> Hillsborough,NC 27278 <br /> JOB; Battle court Terms: <br /> Description: Amount: <br /> INTERIOR; <br /> MAIN ROOM; <br /> Remove existing panel wood boards at two sides of the room(demolition) 650.00 <br /> Install new insulation at all areas as needed(new drywall areas) 1,750.00 f <br /> Install new Vapor Retarder from top of wall to bottom(only at drywall areas) 1,800.00 <br /> Install flexible flashing at door and window openings. <br /> Install gypsum wallboard over all areas of completed vapor retarder 2,500.00 <br /> Finish all drywall(level 4)and leave ready for paint. <br /> Skim coat other existing walls <br /> Re install new wall wood panel boards at two side walls(above chair rail)match existing design 2,500.00 <br /> Re install fabric panels <br /> Install baseboards and trim pieces as needed <br /> Prime and paint walls and trim(one coat of primer and two coats of paint) 3,800.00 <br /> Includes New wall panel boards,Drywall and trim boards Except windows. <br /> Calk and prep areas needed <br /> BACK ROOM; <br /> Install new insulation at all areas as needed(new drywall areas) 850.00 <br /> Install new Vapor Retarder from top of wall to bottom(only at drywall areas) 700.00 <br /> Install flexible flashing at door and window openings. <br /> Install gypsum wallboard over all areas of completed vapor retarder 1,200.00 <br /> Finish all drywall(level 4)and leave ready for paint. <br /> Install baseboards and trim pieces as needed 700.00 <br /> Prune and paint walls and trim(one coat of primer and two coats of paint) 1,000.00 <br /> Caulk and prep areas needed <br /> NOTES; <br /> THIS QUOTE INCLUDES MATERIALS AND LABOR <br /> FOLLOW SCOPE OF WORK PROVIDE BY 5TH WALL BUILDING CONSULTANTS <br /> Total $17,450.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.