Browse
Search
Minutes 04-25-2013
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
2010's
>
2013
>
Minutes 04-25-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2013 12:17:57 PM
Creation date
9/6/2013 11:02:33 AM
Metadata
Fields
Template:
BOCC
Date
9/9/2013
Meeting Type
Schools
Document Type
Minutes
Document Relationships
Agenda - 04-25-2013 - Agenda
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2013\Agenda - 04-25-2013 - Budget Work Session
Agenda - 04-25-2013 - 1
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2013\Agenda - 04-25-2013 - Budget Work Session
Agenda - 04-25-2013 - 2
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2013\Agenda - 04-25-2013 - Budget Work Session
Agenda - 04-25-2013 - 3
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2013\Agenda - 04-25-2013 - Budget Work Session
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Paul Laughton said the district needs to look at how much debt can be taken on and <br /> how it looks outside of year 5. Paul Laughton said this debt is consistent with what has been <br /> requested with debt proceeds. He said that, realistically, Culbreth would do one time financing <br /> the first year, to total $4.9 million; and then middle school #5 would follow that project. He said <br /> the middle school is a $39.8 million project. He said all of this depends when the financing is <br /> done and the timing will change the debt capacity and the amounts of overage on the 15% <br /> debt capacity. <br /> Frank Clifton said the state created a new board a year ago that reviews debt <br /> separately from the LGC, who authorizes debt. He said projections for the general fund are <br /> conservative but not unrealistic. He said some of the lack of growth in the county's general <br /> fund budget is a result of state activity and is beyond the control of the county. He said the <br /> county could decide to move forward on the science wing, only to be required to defer <br /> something else in a couple of years. He said this just needs to be kept in mind when making <br /> decisions. <br /> Commissioner Gordon asked to see the last two slides from CHCCS. She noted that if <br /> the middle school is moved back two years, while putting the science wing in, it improved the <br /> scenario and debt service is now under the 15% level. She said the CIP is approved for 5 <br /> years and funded for the first year, and this proposal improves the debt service picture for the <br /> 5 year period. She re-visited the slide information showing this improvement in the debt <br /> service picture when compared with the manager's original CIP recommendations. <br /> Todd Lofriese said the last two slides provide a brief overview of history and some <br /> information about the proposed science wing addition. He reviewed the information on the <br /> PowerPoint slides as follows: <br /> Culbreth Science Wing <br /> • Long standing need, on CIP since 2002 <br /> - Existing labs lack water, space, windows, few hands on lessons, poor sequencing <br /> • Unsuccessful QSCB application 2012 <br /> • Cell tower revenue funded a single lab <br /> • Design funded with 12-13 CIP funds <br /> • BOE resolution requesting funding on Feb 7, 2013 <br /> Culbreth Science Labs <br /> ■ 6 Room Science Lab Addition <br /> ■ Addresses required code issues <br /> - Bathrooms, electrical, fire alarm, emergency generator, etc. <br /> ■ Provides small assembly space <br /> ■ Likely increases building capacity by 104...a 2 year delay for MS #5 <br /> CHCCS Board Member Jamezetta Bedford asked for clarification on the Cedar Ridge <br /> High School (CRHS) proposed wing, which is listed in 2015 on one CIP sheet and then as a <br /> need in ten years on SAPFO. <br /> Superintendent Rhodes said there are many sub-divisions coming on line; and OHS <br /> capacity had been downgraded significantly, so there is a request for this to happen. <br /> OCS Chair Coffey added that it was discovered that Hampton Pointe is not even on <br /> the radar for capacity and CRHS is already over capacity and Orange High has been <br /> reassessed. She said this will come sooner than originally thought and the district projections <br /> are standing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.