| (Corporate Water Easement Without Mortgage)    		BOOK 184  P�;(f   50
<br />			NORTH CAROLINA
<br />			ORANGE COUNTY							DEED OF EASEMENT
<br />   				THIS DEED OF EASEMENT, made and entered into this the     /7   	day of OeeLpAkAA/
<br />			199a, by and between  County of Orange, hereinafter referred to as "COUNTY" and ORANGE WATER AND
<br />			SEWER AUTHORITY,a public body and body politic and corporate created and existing under Article 1,Chapter
<br />			162A of the General Statutes, with its principal office at 406 Jones Ferry Road in Carrboro, North Carolina,
<br />			hereinafter referred to as OWASA;
<br />  									WITNESSETH:
<br />     													8�0 -as -- FsZ-7     -Z zy_. S'z,,,�
<br />      				THAT WHEREAS, OWASA has constructed and proposes to construct a water distribution system for
<br />			the use of its citizens and for that purpose has constructed and proposes to construct lines of pipe and mains
<br />			necessary for the proper transmission and distribution of waters.
<br />      				NOW,THEREFORE,in consideration of the sum of One and No/100($1.00)Dollar and other good and
<br />			valuable considerations paid to the COUNTY, the receipt of all of which is hereby fully acknowledged, the said
<br />			COUNTY does hereby give, grant, quit-claim, and convey unto the OWASA, its successors and assigns, the right,
<br />			privilege, and perpetual easement to go in and upon a strip of land thirty feet (30') in width described herein and
<br />			owned by the COUNTY,lying and being in the Town of Chapel Hill.Chapel Hill Township,Orange County, North
<br />			Carolina, the said strip of land thirty feet (30') in width being more particularly described on the plat as recorded
<br />			with the Orange County Register of Deeds, Plat Book 78, page 88.
<br />      				And, OWASA, Grantee, shall have the right to construct and maintain in, under,  and/or above, along
<br />			and through said strip of land  thirty feet (30') in width such mains and lines of pipe as shall be necessary.�or the
<br />			proper construction and operation of said water distribution system;OWASA shall also have the right of ingress and
<br />			regress through, over,and across the land of the COUNTY to and from said strip at such times as OWASA deems
<br />			it necessary for the purpose of constructing, maintaining and inspecting said lines and of making all necessary
<br />			alterations and repairs thereto;the lines of pipe shall be located at such point or points,elevation or elevations below
<br />			or above the surface of the earth as shall be necessary,for proper operation of the system, and shall be established
<br />			at the proper grade for running said lines and for conveying water as aforesaid; and OWASA shall have the right,
<br />			privilege and easement to tap the line or lines and construct water laterals from the main to the outside boundary of
<br />       		the right-of-way over which this easement and privilege extends;and,OWASA shall have the privilege,easement,and
<br />			right to clear and keep cleared the full width of the easement of and from brush, plants, trees, and any and all other
<br />			materials, obstructions, structures, and encroachments of any kind;
<br />      				The County shall retain the right to cultivate the ground lying within the boundaries of the easement,
<br />			provided that such cultivation shall not interfere with the right of OWASA herein named of ingress and egress to said
<br />			easement for the purpose of maintenance and repair of said water main or mains or the construction and repair of
<br /> |