Browse
Search
Agenda - 12-16-1997 - 9d
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1997
>
Agenda - 12-16-1997
>
Agenda - 12-16-1997 - 9d
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2013 11:30:43 AM
Creation date
9/3/2013 11:30:41 AM
Metadata
Fields
Template:
BOCC
Date
12/16/1997
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
9d
Document Relationships
1997 NS Purchasing - RTD Associates Contract approval Roof Survey
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\1990's\1997
Minutes - 19971216
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DT10 <br /> RID <br /> Associates, P.A. <br /> ROOF DIAGNOSTIC PROPOSAL <br /> November 4, 1997 <br /> Mr. Wilbert J. McAdoo Re: Visual Roof Analysis <br /> Director of Public Works Selected Roof Areas <br /> Highway 86 North <br /> Hillsborough,NC 27278 <br /> Dear Mr. McAdoo: <br /> As a Professional Engineering firm specialimg m the specific areas of Roof Diagnostics, Engineering, <br /> Design, and Project Management, we respectfully request your consideration of the following <br /> proposal. <br /> We propose to provide our specialized Roof Engineering expertise as listed below for the above <br /> referenced project. <br /> ROOF VISUAL DIAGNOSTIC SERVICES <br /> 1. Visual Analvsis <br /> A thorough visual inspection shall be performed of the roof surface area to locate, identify, and <br /> photographically document the surface deficiencies, including those relating to current or <br /> anticipated water entry. <br /> 2. Conclusionsffimmmendations <br /> A statement pertaining to the roofs current state of condition and relative problems shall be <br /> made, followed by a statement discussing the various alternatives of viable corrective actions. <br /> 3. Budget Costs <br /> A preliminary estimate of contractor's labor and material costs for the recommended corrective <br /> actions shall be calculated. A roof service life chart will also be included to illustrate the pro- <br /> rated life cycle costs of maintenance costs versus replacement costs and potential extended <br /> service life through maintenance. <br /> Roof Engineering Technology, Diagnostics&Design <br /> 5500-117 Executive center Drive- Charlotte, NC 28212-8821 - 704.536.3322 Fax 704.536.4233 <br /> Fort Mill,SC- Isle of Palms,SC <br />
The URL can be used to link to this page
Your browser does not support the video tag.