Browse
Search
Agenda - 12-16-1997 - 9d
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1997
>
Agenda - 12-16-1997
>
Agenda - 12-16-1997 - 9d
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2013 11:30:43 AM
Creation date
9/3/2013 11:30:41 AM
Metadata
Fields
Template:
BOCC
Date
12/16/1997
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
9d
Document Relationships
1997 NS Purchasing - RTD Associates Contract approval Roof Survey
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\1990's\1997
Minutes - 19971216
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br /> NAME: Mr. Wilbert I McAdoo, Director of Public Works Orange County Page 2 <br /> PROJECT: Roof Analysis, Selected Roof Areas <br /> DATE: November 4, 1997 <br /> 3. Core SawRle Analysis <br /> Core samples of the roof assembly shall be taken and evaluated to determine: <br /> a. The type,quantities,and condition of the various materials which are contained within <br /> the roof assembly. <br /> b. The condition of roof substrate (deck) shall be determined and documented at the <br /> location of the core sample taken. <br /> Written and photographic documentation shall be provided to illustrate the above factors. <br /> 4. Roof Drainage Profile AnaWis <br /> a. An examination and calculation of the existing drainage integrity and capacity shall <br /> be made and compared with the actual existing requirements. <br /> b. Calculated documentation of any dead load contribution by ponding water shall be <br /> performed. A roof plan illustrating approximate size and location of drainage <br /> deficiencies shall be included. <br /> 5. EneM Loss Evaluation <br /> A formatted comparison of the as-designed "R" Value with the existing "R" Value shall be <br /> compiled to reflect,in dollars,any energy loss due to sub-surface moisture or wet insulation. <br /> 6. Serviceability Forecast <br /> A mathematical calculation will be performed to illustrate the longevity, as affected by the <br /> compounding nature of existing roof problems or deficiencies. A lineal chart will be provided <br /> to graphically illustrate the anticipated effective roof service life remaining. <br /> 7. Conclusions/Recommendations <br /> A statement pertaining to the roofs current state of condition and relative problems shall be <br /> made,followed by a statement discussing the various alternatives of viable corrective actions. <br /> 8. Budget Costs <br /> A preliminary estimate of contractor's labor and material costs for the recommended <br /> corrective actions shall be calculated. A roof service life chart will also be included to <br /> illustrate the pro-rated life cycle costs of maintenance costs versus replacement costs and <br /> potential extended service life through maintenance. <br /> Roof Engineering Technology, Diagnostics &Design RTD <br /> 5500 Executive Center Drive,Suite 117•Charlotte,NC•28212-8821 704.536.3322 Fax 704.536.4233 Associates, P.A. <br />
The URL can be used to link to this page
Your browser does not support the video tag.