Browse
Search
Agenda - 12-16-1997 - 9d
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1997
>
Agenda - 12-16-1997
>
Agenda - 12-16-1997 - 9d
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2013 11:30:43 AM
Creation date
9/3/2013 11:30:41 AM
Metadata
Fields
Template:
BOCC
Date
12/16/1997
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
9d
Document Relationships
1997 NS Purchasing - RTD Associates Contract approval Roof Survey
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\1990's\1997
Minutes - 19971216
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PT 5 <br /> Associates, P.A. <br /> ROOF DIAGNOSTIC PROPOSAL <br /> November 4, 1997 <br /> Mr. Wilbert J. McAdoo Re: Roof Analysis <br /> Director of Public Works Selected Roof Areas <br /> Highway 86 North <br /> Hillsborough,NC 27278 <br /> Dear Mr. McAdoo: <br /> As a Professional Engineering firm specializing in the specific areas of Roof Diagnostics,Engineering, <br /> Design, and Project Management, we respectfully request your consideration of the following. <br /> proposal. . <br /> We propose to provide our specialized Roof Engineering expertise as listed below for the above- <br /> referenced project. <br /> ROOF DIAGNOSTIC SERVICES <br /> 1. Visual Analvsia <br /> A thorough visual inspection shall be performed of the roof surface area to locate, identify, <br /> and photographically document the surface deficiencies, including those relating to current <br /> or anticipated water entry. <br /> 2. Sub-Surface Moisture Evaluation <br /> A complete and thorough sub-surface moisture evaluation shall be performed using infra-red <br /> thermographic and nuclear hydrogen detection equipment. All areas of sub-surface moisture <br /> or wet insulation shall be located and confirmed by galvanic moisture probing or core sample. <br /> The anomaly(sub-surface moisture)will be delineated onto the roof surface and plotted by <br /> size on an accompanying roof plan. Written and photographic documentation will also be <br /> provided to support all information gathered and evaluated. <br /> Roof Engineering Technology, Diagnostics&Design <br /> 5500-117 Executive Center Drive • Charlotte,NC 28212-8821 • 704.536.3322 Fax 704.536.4233 <br /> Fort Mill,SC• Isle of Palms,SC <br />
The URL can be used to link to this page
Your browser does not support the video tag.