Browse
Search
Agenda - 09-09-2013 - E1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 09-09-2013 - Quarterly Public Hearing
>
Agenda - 09-09-2013 - E1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2015 2:08:31 PM
Creation date
8/30/2013 4:32:40 PM
Metadata
Fields
Template:
BOCC
Date
9/9/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
E1
Document Relationships
Minutes 09-09-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 5: Uses <br />Section 5.13: Standards for Agricultural Uses <br />The Operations Plan and the Rehabilitation Plan shall be coordi9xted so <br />that the amount of disturbed land is kept to the absolute minim m <br />consonant with good practices and so that rehabilitation pro eds in <br />oncert with extraction. <br />(1) No nd disturbance shall take place within 250 feet of e zoning lot line <br />or th roperty line where the zoning line and the pr erty line are one <br />and the ame. Within the 250 foot setback area isting vegetation <br />shall be r ined for the purpose of providing a sual screen and noise <br />buffer. No turbance or removal of vegetati shall be permitted <br />except for acc s roads leading from the e avation area to public <br />roads. Where ve tation within the 250 f t setback does not exist, the <br />applicant shall be r uired to provide ense, evergreen buffer <br />consistent with the pu ose cited ab e. The buffer shall be in place <br />prior to the initiation of a excav on activities. <br />(m) The applicant shall submit o tional reports, prepared on an annual <br />basis, detailing the amounts aterials extracted, extent of extractive <br />area, depth of extractive a a, an results of groundwater test borings. <br />(n) Annual inspections of e operations all be conducted by the Planning <br />Director following su ittal of the annu operations reports to determine <br />compliance with t provisions of the Spe ial Use Permit. <br />(o) In cases of ab donment or termination of op ations for a period of 12 <br />consecutive onths, application for a new Spec I Use Permit is <br />required. <br />(p) The B rd of County Commissioners shall require for I extractive uses <br />a pe ormance guarantee to insure that the provisions o e <br />R abilitation Plan are met. Such performance guarantee all be in a <br />rm approved by the County Attorney. The amount of such arantee <br />shall cover the cost of rehabilitation on a per acre basis, if the c t does <br />not exceed the amount posted with the State. If the rehabilitation st <br />exceeds the amounts required by the State then the difference shall <br />made up in a bond to Orange County. <br />5-111 Gorrnmr erca l Feeder Oper tiG1r24 <br />(A) �`_nnnrnl C4;and;ard-r <br />24 This is a bona fide agricultural use and cannot be regulated by zoning so staff is suggesting it be removed from <br />the UDO. <br />Orange County, North Carolina — Unified Development Ordinance Page 5 -117 <br />56 <br />
The URL can be used to link to this page
Your browser does not support the video tag.