Orange County NC Website
2 <br />f. Growth Management System Designation -- Urban. <br />g. Existing Conditions -- The property is developed and utilized to <br />support a metal fabrication business. <br />h. Access -- The property has direct access onto Southern Drive. <br />Surrounding Land Uses: a. North — Southern Drive, Railroad tracks, R -1 zoned property north <br />of the tracks. <br />b. East — Undeveloped R -1 zoned property. <br />c. South — Undeveloped R -1 zoned property. <br />d. West — R -1 zoned property, one with a single - family residence. <br />Please refer to Attachment 2 for a vicinity map denoting the subject <br />parcel and surrounding properties. <br />Proposal: The property is currently split zoned. As detailed within Attachment 1, the purpose of <br />the amendment is to extend the 1 -1 zoning designation over the entire property. <br />Required parking area and septic system serving the existing industrial operation is located on <br />the R -1 zoned portion of property. <br />The applicants are concerned over their continued ability to have septic and parking supporting <br />the existing industrial operation on the residentially zoned portion property. They are seeking to <br />rectify the problem by extending the existing industrial zoning to ensure their perpetual ability to <br />maintain the existing infrastructure necessary for the business. <br />As some people may recall, when zoning was originally established former staff recommended <br />extending non - residential zoning designations only on those portions of property actively utilized to <br />support non - residential activity, typically only around building area(s). As a result, required parking, <br />septic areas, land use buffers, etc. were more than often not included as part of the non - residentially <br />zoned parcel. This creates problems for owners of these non - residentially zoned properties as <br />current staff interpretation is `residentially' zoned property cannot be used to support non - residential <br />land uses. In many instances property owners find it difficult to maintain the infrastructure necessary <br />to keep their non - residential operations functioning. <br />This is a situation that occurs throughout the County. Staff will be presenting a solution to address <br />these problems at a future meeting. Staff did not, however, want to delay the applicants any further <br />and agreed to work with them to bring this request to the BOCC for action. <br />Staff Analysis: In accordance with Section 2.8 of the LIDO, the Planning Director is required to <br />`cause an analysis to be made of the application' and forward that analysis on to the reviewing <br />body. In completing the required analysis, the Planning Director has found: <br />1. The application has been deemed complete in accordance with the requirements of <br />Section 2.8 of the LIDO. <br />2. The property is of sufficient size to be rezoned to the 1 -1 zoning designation. <br />3. The rezoning is consistent with the Orange County 2030 Comprehensive Plan Future <br />Land Use Map and the adopted the Growth Management System map. <br />