Orange County NC Website
5 <br />21. Prior to issuance of a Building Permit, it will be necessary to provide a Fire Flow Report, signed and <br />sealed by a professional engineer licensed in North Carolina, indicating compliance with the Town's <br />standards. <br />22. If a commercial kitchen is proposed, it will be necessary to provide Orange County Health Approvals <br />as part of the Building Permit application. <br />23. We recommend that the proposed crosswalk pavement markings at the driveway entrance be removed <br />from the plans. <br />24. Prior to a Building Permit it will be necessary to provide a Construction Management Plan to show <br />staging areas, construction trailer location and address construction personnel parking. <br />25. Please see the attached OWASA letter. <br />26. It will be necessary to submit revised plans prior to issuance of a Building Permit, indicating the <br />location of the silt fence, the construction entrance, and the silt fence location. Please include filter <br />fabric detail to be located under the riprap. <br />27. It will be necessary to submit revised grading plans, prior to issuance of a Building Permit. <br />Reviewed/Approved: Administration X Date: August 7, 2013 <br />Issued By: <br />Judy Johnson <br />Cc: Mike Taylor <br />Emily Cameron <br />Ernest Odei -Larbi <br />Nick Parker <br />Dace Bergen <br />Jeff Scouten <br />Patric Le Beau <br />