Browse
Search
Agenda - 09-05-2013 - 5a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 09-05-2013 - Regular Mtg.
>
Agenda - 09-05-2013 - 5a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2015 2:52:50 PM
Creation date
8/30/2013 10:54:13 AM
Metadata
Fields
Template:
BOCC
Date
9/5/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5a
Document Relationships
Minutes 09-05-2013
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 <br /> 1 1. Continuation of review and discussion of the Manaqer's Recommended FY 2013 - <br /> 2 18 Capital Investment Plan (CIP) <br /> 3 <br /> 4 Paul Laughton from Financial Services Administration introduced this item. He said the <br /> 5 plan was to continue the discussion where the County Commissioners left off. <br /> 6 He made reference to pages 53-55 and said staff noticed some errors in the formulas <br /> 7 and made some changes. These pages are spreadsheets of the sales tax fund summary. <br /> 8 <br /> 9 Water and Sewer Utilities Capital Proiects: <br /> 10 There is no additional funding for the five-year CIP for Central Efland/North Buckhorn <br /> 11 Sewer Expansion. There are grant monies and state revolving loan funds for this. <br /> 12 <br /> 13 On page 59, there is $621,250 for year one and the main pump station for Efland sewer <br /> 14 system replacement. Maps are located on pages 67-69. <br /> 15 Commissioner Price asked when Mebane would be taking over and Kevin Lindley said <br /> 16 this phase is in the design stage now and it would be probably two years. <br /> 17 On Page 60, there is no additional funding for Lake Orange. This will become part of the <br /> 18 annual maintenance budget after this year. <br /> 19 On Page 61, Buckhorn EDD Phase 2 makes gravity sewer available to an additional 400 <br /> 20 acres of land in the Phase 2 area. Phases 3 and 4 are funded in years 2 and 3. <br /> 21 Richmond Hills Pump Station Rehabilitation is on page 64. This was installed in 2001 to <br /> 22 serve the Richmond Hills Subdivision built by Habitat for Humanity. According to Orange Water <br /> 23 and Sewer Authority (OWASA), who perform our routine maintenance, the standard duty <br /> 24 schedule is 10 years for pumps and controls and 20 years for generators. Because our current <br /> 25 customer rates do not generate enough revenue to provide for a capital reserve, we are <br /> 26 proposing to replace the pumps and controls at the 15-year mark. As a matter of policy, sewer <br /> 27 lift stations should be limited if possible and/or operating rates or developer payment in lieu of <br /> 28 capital reserve should also be considered. This project will include replacement of the pumps <br /> 29 and electrical controls, additional of SCADA remote monitoring equipment and wet well <br /> 30 rehabilitation, if necessary. NOTE: when the connection between Efland Sewer and the City of <br /> 31 Mebane sewer system is complete, Mebane will be responsible for all utilities, including this <br /> 32 pump station. <br /> 33 Hillsborough EDD is on page 65. The funding for this is in the out years, years 6-10. <br /> 34 There is a separate map on page 68. <br /> 35 The Eno EDD is on page 66 and has construction funding in year 2. <br /> 36 Commissioner Price asked if this plan would be affected if the State moves forward that <br /> 37 cities cannot provide monies to areas outside their corporate lines. <br /> 38 Clarence Grier said this could possibly affect the plan, but since this is a county project, <br /> 39 Orange County would not be affected since it is providing the funding. <br /> 40 Chair Jacobs made reference to the Perry Hills subdivision in Mebane and said there are <br /> 41 repeated concerns about septic failures. He asked if this has come to the attention of the staff. <br /> 42 Kevin Lindley said he does not know of these issues and no one has contacted him <br /> 43 about this. <br /> 44 Chair Jacobs asked for a report back on this and Clarence Grier said he would follow up. <br /> 45 <br /> 46 Solid Waste <br /> 47 This starts on page 70. <br /> 48 Commissioner Rich asked about the recycling operation and getting the towns to stick <br /> 49 with the County with the roll out carts. There was some sort of matching fund for the carts. She <br /> 50 asked if the County would lose the matching fund if the rollout carts were not done this year. <br />
The URL can be used to link to this page
Your browser does not support the video tag.