Orange County NC Website
11 <br /> 1 needs to be re-surfaced and widened by 2 feet on each side. He said this road services about <br /> 2 1500 cars per day in the rural part of the county. He said the second road is Lebanon Road, <br /> 3 which extends from Stagecoach to Efland Cedar Grove Road and is proposed for re-surfacing <br /> 4 and widening. He said this road carries about 1800 cars per day. He said these two roads <br /> 5 account for $650,000 of the secondary roads construction program, which leaves the balance at <br /> 6 $50,080. This will be used to survey other roads and areas of need. <br /> 7 Commissioner porosin asked how widening the road helps and eases congestion. <br /> 8 Mike Mills said this is not done to ease congestion, but it helps with safety. Widening <br /> 9 prevents large tires, such as those on trucks and buses, from being close to the edge. He <br /> 10 noted that these rural roads are commonly used by bicyclists, and this increases safety for them <br /> 11 as well. <br /> 12 Commissioner Price asked about the other parts of New Sharon and if there are 2 foot <br /> 13 shoulders on these areas. <br /> 14 Mike Mills said the south side has already been done. <br /> 15 <br /> 16 NO PUBLIC COMMENT <br /> 17 <br /> 18 Chair Jacobs said Mike Mills and another DOT representative attended the Burlington <br /> 19 MPO, where the strategic mobility formula was presented. He said this included the process of <br /> 20 normalization with regard to funding. He suggested that after this is passed and the state <br /> 21 Board of Transportation votes in August, perhaps Mike Mills could come back to exchange the <br /> 22 forthcoming changes. <br /> 23 Commissioner McKee said he appreciates the widening on Highway 57, as well as the <br /> 24 area of New Sharon that has already been done. He said it is a great safety improvement. He <br /> 25 asked if there was any way that the future widening could be 3 feet instead of 2 feet. <br /> 26 Mike Mills said the unpaved roads have been reduced to almost nothing. He said that <br /> 27 there are some rural roads that still have safety issues, and the shoulders are intended to <br /> 28 address this. <br /> 29 Commissioner Gordon thanked the DOT for coming <br /> 30 <br /> 31 A motion was made by Commissioner Gordon, seconded by Commissioner McKee to close the <br /> 32 public hearing and adopt the North Carolina Department of Transportation's Proposed 2012- <br /> 33 2013 Secondary Roads Construction Program for Orange County. <br /> 34 <br /> 35 VOTE: UNANIMOUS <br /> 36 <br /> 37 b. Oranqe-Alamance Boundary Land Use and Zoninq Atlas Amendments - Public <br /> 38 Hearinq Closure and Action (No Additional Comments Accepted) <br /> 39 The Board received the Planning Board's recommendation, closed the public hearing, <br /> 40 and made a decision on Planning Director initiated map amendments to the 2030 <br /> 41 Comprehensive Plan Future Land Use Map and the Zoning Atlas to extend land use categories <br /> 42 and zoning for parcels being located within Orange County's planning jurisdiction in conjunction <br /> 43 with the formalization of the Orange-Alamance county line. <br /> 44 Michael Harvey said this is with regard to the extension of existing zoning and land use <br /> 45 designations for eleven properties along Eliza Lane. He referenced the map in the <br /> 46 Commissioners' packets. He reviewed the map and the Planning Director's recommendations. <br /> 47 Commissioner porosin referred to the map and asked if the section outlined in yellow is <br /> 48 part of the existing parcels immediately to the right. <br /> 49 Michael Harvey said yes, and he distinguished the existing and previous county line. <br /> 50 <br />