Orange County NC Website
4 <br /> BERE MITCHELL <br /> 611 BYNUM ST. <br /> CHAPEL,NC <br /> 968-3943 <br /> EXTERIOR: <br /> 1.Remove the shrubs from the rear and right side of the house <br /> 2.Install pressure treated wooden handrails on the front porch with 2x2 pickets. <br /> Install steps and handrail of pressure treated lumber.Rise to be no more than 7 inches. <br /> 3.Install aluminum,continuous gutter and downspouts.Install splashblocks under <br /> each downspsout. <br /> FOUNDATION: <br /> 1. Prepare a 4x4 area at the right side entrance.Pour a footer.Lay <br /> 16x 16 inch block to the ground level. <br /> 2.Prepare the interior floor area of the block for concrete.Install flashing against <br /> the house.Install a 4 inch floor drain and extend the drain to 6 feet past the <br /> end of the house.Pour a 4"slab and finish smooth.Lay 16x16 inch block <br /> four courses high. <br /> 2.Prepare the foundation to expose the footer on all sides of the house <br /> 3. Install waterproofing from ground level to the footer. <br /> 4. Install tar mastic from the ground level to the footer.Install 301b.felt from the <br /> ground level of the foundation out three foot from the foundation with a 12 inch lap. <br /> Install 6 mill plastic on top of the felt the length of the rear and right sides of the <br /> house Extend the plastic so that drainage from the downspout will seep into the <br /> perforated pipe.Install rigid perforated pipe on top of the plastic.Encase the pipe with <br /> a siltation sock.Connect the pipe so that it drains properly at the rear of the house <br /> approximately 8 feet from the foundation.Enclose the end of the exposed pipes with <br /> screen wire.This operation to include only the right front,right and rear sides of the <br /> house. <br /> 6. Install 6 inches of 3/4 inch washed stone on top of the pipe.Cover the stone with <br /> dirt,seed and straw. <br /> 7 Prepare and frame a gable roof structure over the side entrance 6'x6'.Install <br /> 2x4 rafters, 1/2 inch sheathing,aluminum drip edge,151b.felt and three tab fiber <br /> glass shingles.Install 2x4 ceiling joists and 1/2 inch BC plywood with comer trim and <br /> lattice over each seam.Install 4x4 pressure treated support posts.Install step flashing <br /> scored into the concrete block. <br /> DOORS AND HARDWARE: <br />