Browse
Search
Agenda - 12-01-1997 - 8f
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1997
>
Agenda - 12-01-1997
>
Agenda - 12-01-1997 - 8f
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2013 12:42:26 PM
Creation date
8/29/2013 12:42:25 PM
Metadata
Fields
Template:
BOCC
Date
12/1/1997
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8f
Document Relationships
1997 NS Housing - Taylor Home Improvements Housing Rehabilitation Contract Award
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\1990's\1997
Minutes - 19971201
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br /> i <br /> 8. Replace the existing metal towel bars in the bath. <br /> 9. Install a wooden handrail to the basement. <br /> 10. Install 3'6"handbar on the long wall of the tub. <br /> 11.Provide a transfer seat in the bath. <br /> 12.Install carpet and pad in all rooms but the kitchen and bath.Carpet allowance <br /> to be S14/sq.yd. <br /> 13.Install 3/8 inch BC plywood in the bath.Prepare the plywood for vinyl.Install <br /> vinyl floor covering,shoemold and metal trim. <br /> PAINTING: <br /> 1.Prepare the interior for paint.Paint the ceilings with ceiling white latex,the walls <br /> with flat latex and the trim with semigloss latex.Paint to cover completely.Remove all <br /> old paint from the windows. <br /> 2.Prepare the exterior surfaces for paint,including all doors,windows.railings, <br /> ceilings,except pressure treated wood.Paint to cover completely. <br /> PLUMBING: <br /> 1.Install a handicap commode in the bath.Install a new supply line and cutoff. <br /> 2.Install new faucets in the tub,lavatory and kitchen sink.Install new supply lines and <br /> cutoffs. <br /> 3. Reinstall the lavatory,install new Trap. <br /> HEAT AND AIR CONDITIONING: <br /> 1. Install a gas pack heat and air conditioning system for the upstairs only. <br /> Install insulated duct work.Make all necessary connections for electric and gas <br /> INSULATION: <br /> 1.Insulate the attic to R-30. <br /> 2.Insulate the basement ceiling to R-19. <br /> 3.Install R-19 under the laundry room floor. <br /> 4.Install a 6 mill vapor barrier under the laundry room/ <br /> Provide a termite inspection and treatment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.