Browse
Search
Agenda - 12-01-1997 - 8f
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1997
>
Agenda - 12-01-1997
>
Agenda - 12-01-1997 - 8f
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2013 12:42:26 PM
Creation date
8/29/2013 12:42:25 PM
Metadata
Fields
Template:
BOCC
Date
12/1/1997
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8f
Document Relationships
1997 NS Housing - Taylor Home Improvements Housing Rehabilitation Contract Award
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\1990's\1997
Minutes - 19971201
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br /> 1. Install a six panel,metal insulated door unit at the basement entrance. <br /> Install silicone sealant under the threshold. Install lockset and deadbolt with <br /> matching keys. Install a peephole.Install snatching interior trim. <br /> 2.Install a six panel metal insulated 3-0 door unit at the front entrance.Install <br /> a lockset and deadbolt keyed to the basement locks.Install a peephole.Install <br /> matching interior trim.Repair all areas disturbed by this operation. <br /> 2..Install three wood core,seamless aluminum storm doors with pneaumatic closures <br /> and vinyl sweeps. <br /> 3.Install a crawlspace access door of 3/4 inch exterior grade plywood with a <br /> 2x6 pressure treated frame.Install galavanized hinges and locking hasp. <br /> 4. Install door bumps on all doors. <br /> 5. Remove the existing closet doors in the dining room and install new sliding <br /> doors complete with hardware. <br /> 6.Prepare and frame the opening to the basement and install a prehung wood, <br /> interior door unit and hardware.Install 1/4 inch paneling and trim on the bare <br /> studs <br /> WINDOWS: <br /> 1.Inspect all windows and insure proper operation. <br /> 2.Replace all broken glass. <br /> 3. Install two vinyl,insulated replacement windows in the laundry room. <br /> 4. Install triple track storm windows on all windows but the laundry room and <br /> front picture window. <br /> INTERIOR: <br /> 1.Repair the existing sheetrock/plaster by covering all cracks with fiberglass mesh <br /> tape,covering all holes and railheads.Finish all repairs smooth. <br /> 2. Install shoemold in the utility room. <br /> 3. Remove the wall covering to the studs in the bath. <br /> 4.Install MR sheetrock on the walls.Tape and finish smooth. <br /> 5.Install 13/4 inch crown mold and baseboard in the bath. <br /> 6.Install a fiberglass tub enciosurer kit with comer shelves. <br /> 7.Repair the existing ceiling in the utility room.Spray with ceiling texture so that <br /> the repairs match the existing texture. <br />
The URL can be used to link to this page
Your browser does not support the video tag.