Browse
Search
Agenda - 12-01-1997 - 4a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1997
>
Agenda - 12-01-1997
>
Agenda - 12-01-1997 - 4a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2013 12:06:29 PM
Creation date
8/29/2013 12:06:25 PM
Metadata
Fields
Template:
BOCC
Date
12/1/1997
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4a
Document Relationships
Minutes - 19971201
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18 <br /> How was the transmission line route determined? <br /> An extensive eight-month study indicated the least intrusive and most cost effective route <br /> is a 2 `/2 -mile line running east to west, crossing University Station and Murphy School <br /> roads. The study sought to balance environmental, engineering and real estate <br /> considerations. <br /> Was an underground transmission line considered? <br /> An underground transmission line was considered, but because it would cost from 6-8 <br /> times more than an overhead line, it was not economically feasible. We will make every <br /> effort to make the overhead line as compatible as possible with the natural setting. <br /> How much will this project cost? <br /> We estimate the total project cost will be about $1.8 million. <br /> Why was the preferred transmission line route announced on Thursday,November <br /> 20? <br /> On Monday,November 17, we completed our extensive routing study and identified our <br /> preferred route. Before we could announce our decision, we felt obligated to identify and <br /> notify the affected property owners along this route. We completed these notifications on <br /> Thursday,November 20, which allowed us to make a public announcement. <br /> Why did Piedmont EMC not inform the Orange County Commissioners on <br /> Wednesday,November 19 that a decision had been made? <br /> We felt an obligation to inform the affected property owners along the preferred route <br /> first. <br /> Why did Piedmont not delay the decision as requested by the Orange County <br /> Commissioners? <br /> We did not wish to prolong the anxiety voiced by residents along the other proposed <br /> routes. <br /> How long will the project take? <br /> Once construction begins, we estimate the project will take about nine months. We hope <br /> to have it completed and energized by the end of 1998. <br />