Orange County NC Website
• ;moo <br /> . U <br /> � 1 <br /> STATE OF NORTH CAROLINA <br /> DEPARTMENT OF TPANSPORTATION <br /> JAMES B. HUNT JR. DIVISION OF HIGHWAYS GARLAND B. GARRETT JR. <br /> GOVERNOR P. O. Box 766 SECRETARY <br /> Graham, North Carolina 27253-0766 <br /> 16 September 1997 <br /> ORANGE COUNTY <br /> Eddie Kirk <br /> Orange County Planning Department <br /> 306F Revere Road <br /> Hillsborough, NC 27278 <br /> 919 732-8181 EXT 2580 <br /> SUBJECT: Final Plan Review: State Employees Credit Union <br /> (Hillsborough) <br /> Dear Mr. Kirk: <br /> This office has completed its review of the subject ' s proposed <br /> final plans for compliance with current Department of Transportation <br /> minimum construction standards. We wish to advise that the final <br /> plans received at this office on 12 September 1997 are under standby <br /> status awaiting revisions . Pursuant to any approval, this office <br /> will require the owner/developer to meet the following requirements <br /> before starting any construction. <br /> 1 . Prior to any construction of any new access or alteration of any <br /> existing access within the right of way, the developer/owner is <br /> required to secure a permit with this office. It is the <br /> responsibility of the owner/developer to obtain a permit. <br /> 2 . During the construction, it is the responsibility of the <br /> owner/developer to provide verification certifying that the <br /> roadway surface, drainage, and seeding satisfies the approved <br /> design outside the State ' s right of way. <br /> 3 . When working within the State ' s right of way, the <br /> owner/developer will contact the Graham District Office before <br /> each of the following phases : (A) Drainage, (B) Grading, (C) <br /> Placement of base, (D) Paving, and (E) Seeding. Failure to <br /> notify this office before each phase of construction may justify <br /> a verification certified and signed by a professional engineer. <br /> 5 . Any area within the State ' s right of way and/or easements <br /> disturbed during the construction and/or maintenance shall be <br /> repaired to the satisfaction of the District Engineer or his <br /> representative. <br />