Browse
Search
Agenda - 11-19-1997 - 10a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1997
>
Agenda - 11-19-1997
>
Agenda - 11-19-1997 - 10a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2013 3:36:16 PM
Creation date
8/28/2013 3:36:10 PM
Metadata
Fields
Template:
BOCC
Date
11/19/1997
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
10a
Document Relationships
Minutes - 19971119
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 <br /> Provisional Cane Creek Recommendations <br /> June 26, 1997 . <br /> Page 6 <br /> • Buffer requirements are in place for the reservoir shoreline and along all perennial and <br /> intermittent streams. Buffers must remain in natural vegetation and may only be used <br /> for a limited set of restricted activities. <br /> • Clustering of residential lots is allowed throughout the watershed with no prescriptive <br /> minimum lot size. Additionally, Orange County promotes its innovative Flexible <br /> Development Standards for Preserving Rural Character. <br /> • Water supply and wastewater systems are limited to individual wells and on-site septic <br /> systems. Neither community water nor wastewater systems are allowed in the <br /> watershed. <br /> Adequacy of Existing Programs <br /> The Cadmus Group used Cane Creek field data to customize and calibrate water quality models <br /> to predict the results of future development and management scenarios. Water quality is <br /> predicted to deteriorate substantially as residential development exceeds 25 percent buildout. <br /> The reservoir already exhibits nuisance algae that cause taste and odor problems in treated <br /> water. These are often dominated by species that release harmful toxins under more extreme <br /> conditions. Algal blooms are predicted to quadruple in frequency,to more than 30 percent of <br /> the summer months, as development approaches 100 percent buildout. <br /> Significantly, such a degree of degradation is predicted to result from future activities that <br /> comply with current regulations. As noted, Cadmus determined that these conditions could be <br /> avoided through different combinations of open space preservation, land acquisition, large lot <br /> zoning, cluster development, regional stormwater ponds, and tributary subimpoundments. <br /> The recommendations presented below are the cumulative result of these technical analyses, <br /> community input, and Committee discussion. They attempt to provide a balance between water <br /> quality and stakeholder equity objectives outlined earlier. (Please see the Executive Summary <br /> of the August, 1996 Cadmus Report attached as Appendix B.) <br /> Recommended Changes to Local Regulations <br /> The Committee's primary regulatory recommendation is to amend the Orange County <br /> Zoning Ordinance such that all new residential development in the Cane Creek watershed <br /> occurs either on large lots or in prescribed cluster configurations. <br /> Large Lots <br /> Under the recommended requirement, minimum lot sizes in the Cane Creek watershed would be <br /> the same as currently specified for University Lake; that is, 5-acre minimum,except for parcels <br /> recorded as of June 26, 1997, which could first be subdivided into as many as five 2-acre lots. <br /> Any additional lots created from the parent tract would have to be at least 5 acres. <br />
The URL can be used to link to this page
Your browser does not support the video tag.