Orange County NC Website
Provisional Cane Creek Recommendations 12 <br /> June 26, 1997 <br /> Page 10 <br /> Construction costs are difficult to estimate without a preliminary engineering study, but would <br /> likely be in the 2 to 4 million dollar range. <br /> Further evaluation of tributary subimpoundments will require: <br /> • A preliminary engineering study to determine the general feasibility and cost estimates <br /> for a mini-lake at either the Caterpillar or Tom's Creek sites. <br /> • Monitoring land development and water quality trends that may determine the eventual <br /> need for a subimpoundment. <br /> Overall Implementation Plan <br /> As these recommendations are acted upon by OWASA, Orange County, and other local <br /> governments, it is recommended that the overall findings and management strategy be <br /> incorporated into a formal Implementation Plan. This would specify time tables and <br /> responsibilities for action,ongoing data collection,and a process for periodic Plan reviews and <br /> updates. <br />