Browse
Search
Agenda - 10-21-1997 - 10d
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1997
>
Agenda - 10-21-1997
>
Agenda - 10-21-1997 - 10d
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2013 8:44:15 AM
Creation date
8/15/2013 8:44:14 AM
Metadata
Fields
Template:
BOCC
Date
10/21/1997
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
10d
Document Relationships
Minutes - 19971021
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iUUn rLM414.0*3 ucr i, Jep LL �f tU-UJ r'.UJ/Ub <br /> 9 . <br /> 2 <br /> KEY ISSUES <br /> L T13ffr P : The NOM Carolina Departrnemt of Transportation has prepared traffic, <br /> PrOjeCtIOUS 6or Homettead Road for 2020. These projections indicate that the anticipated traffic <br /> volumes fax Homestead Road range from 9,800 vehicles per day at High School Road to 17,000 <br /> at N.C. 86 1 rithout the Weaver Dairy Connector in place. With the Weaver Dairy Corntaector in <br /> place, the tt sMc whmames increase f M 11,100 at High School Road to 20,100 at N.C. 86. A <br /> map ahwwm i the aligmm em of the Wcovar Dairy Connector is attached. <br /> Staff Comm ml: We have been ccacerned for serene time about the lack of a reliable process for <br /> developing projections of firm traffic. The current model used by the North Carolina <br /> Department if Tronepvrpuiaxi incorporates limited consideration of transit activity and does not <br /> ineorporase the impacts of bicycle an or pedestrian activity. In addition.the eturew model does <br /> not reflect a ther development that has been built since 1985 or changes adopted after 1990 in <br /> Chapel IM:land use plans for Now development. <br /> The traffic volumes included in the September 4, 1997 letter how these North Carolina <br /> Dept of Traospor ion diffier ften projections prepared as part of the 1996 North <br /> Carolina Del artmem of Transportation Deana-Chapel Hill-Carrboro Urban Area Thoroughfare <br /> Plan Report. This Report inchided 2010 projections for Homestead Road traffic The Report <br /> projects 2010 traffic between N.C. 86 and the Weaver Dairy Road Connector to be 7,800 <br /> vehicles per day, while these volumes mould increase to 16,200 between the Connector and <br /> Scawell Scbc of Road.The increase in tnffie on the potion of Aid$om the Connector to <br /> Seawall Scheel Road can be attributed to the merging of the Weaver Dairy Exteneian with <br /> Hamostead Road. It a unclear why the 2020 pe*cdow include sigoffic=tly higher volumes of <br /> traffic on the portion of Homestead Road between the Weaver ley Conmectmr and N.C. S6:We <br /> believe the v ohrenes an this portiere of Homestad Road should be lower than the volumes <br /> projected for he section between Wigh School Road and the Weaver Dairy C one ter. <br /> 2. T aW Ilse.Ejur Among the various changes in land use in the amen served by Hoed <br /> Road a the v meotlp adopted UNC Land Use Plan for the Horace Williams property_ The Plan <br /> proposes a si®i5eaot change in bend use For a large area that would be served in port by <br /> Homestead R od. Naas of there meted lend use,patterns is incorporated bw the currant <br /> model. <br /> Staff Cosmtsa m The UNC Lwd Use Plan proposes that the Weaver Dairy Extension provide <br /> access direeth.,imb tine Horace Williams property railer than connecting back into Homcatesd <br /> Reed as cursady shown in the Durbom-Chapel Hill-Careboto Urbeee Area 7baoughfore Plan. <br /> With this Amp in roadway a0gmmatt,we would tat anticipate the increase im traffic voh nos <br /> along the paetiem of Homestead between the Cosmedor and Seawall School Road We would <br /> anticipaft that this pardon of Homaned Road would experience traffic whine similar to the <br /> section between N.C.86 and the Com mew,projected is the 1996 Thoroughfare Plan Report to <br /> be approximat-Ay 7,800 vehicles pa day. Than vobimes could be aceoermaodated with a three- <br /> lone cross-sect We,whieb has a capacity of 15.000 vesicles par day. <br />
The URL can be used to link to this page
Your browser does not support the video tag.