Orange County NC Website
- --- --- --- -ter �., � J•JJ r.vc,v:r <br /> 7. <br /> 4 <br /> ATTACHMENT I <br /> Preliminary Recommendations <br /> Town of Chapel Hill <br /> 1999-2005 Transportation Project Priority List <br /> (Notations fit bold describe changes from the 1996-2004 List) <br /> 1. Transit Capital Projects(FY1999-2003) <br /> No el ange from 1998-2004 List <br /> 2. South Columbia Street-Improvement of South Columbia from Manning Drive to <br /> Fordt arc Boulevard with bicycle and pedestrian a mmodations:minimize right-of-way <br /> takini x. <br /> No ct ange from 1998.2004 List <br /> 3. Estes Drive Extension-NC 86 to Greensboro Street(Carrborc),widen to three <br /> lanes with five foot bikelanes and sidewalks. <br /> Sidev,aiks added to project,no change in priority ranking <br /> 4. Pope RAW-Ephesus Church Road-construct 5 foot bicycle lanes. <br /> Project advanced from N9 priority in 1998-2004 List <br /> S. Estes Drive-NC 86 to Curtis Road,widen existing roadway to 12-1oot travel <br /> lanes,four-foot bicycle lanes and sidewalks. <br /> Side %Um added to project consistent with Parks and Recreation recommendation, <br /> no chime in priority ranking <br /> 6. Culbr;th Road-US 15-501 South to Smith Level Road(Carrboro)construct 5 foot <br /> bikeh nes and sidewalk. <br /> SidevAks added to project consistent with Planning Board recommendation,no <br /> cltW p in priority ranking <br /> 7. Estes Drive-Curtis Road to Fordhamr,Boulevard-coact sidrwsik along entire <br /> lengtt and pedestrian signal at intersection with Chapel Hill Library Drive. <br /> -" New l►rojec4 cembiolmg sidewalk construction as recommended by Parks and <br /> Rem ation Con mbsioo with priorky project 08 from 1998-2004 List <br /> 8. <br /> Eat F ranklin Stmt construct in fill sidewalks on both aides from Mhot Road to <br /> Eaftdo <br /> Project advanced from#13 priority in 1"8-2004 List <br />