Browse
Search
Agenda - 10-06-1997 - 9c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1997
>
Agenda - 10-06-1997
>
Agenda - 10-06-1997 - 9c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2013 4:55:56 PM
Creation date
8/13/2013 4:55:53 PM
Metadata
Fields
Template:
BOCC
Date
10/6/1997
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
9c
Document Relationships
Minutes - 19971006
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. <br /> JULY 30, 1997 STATUS REPORT ON THE <br /> ORANGE COUNTY NON-TIP TRANSPORTATION PROJECTS LIST <br /> REVIEWED BY THE ORANGE COUNTY COMMISSIONERS ON OCTOBER 2, 1995 <br /> Updated October 9, 1996 and February 18, 1997 <br /> 1) NC 86 / NC 57 - Requested on Oct. 2, 1995 that this intersection be <br /> signalized and have left turn lanes constructed on all approaches. Status as <br /> of May 26, 1997: Partially installed, signalization will be completed after <br /> the access road to the Orange County Maintenance Facility is paved. <br /> 2) NC 86 and New Hope Church Road (SR 1723) - Requested on Oct. 2, <br /> 1995 that left turn lanes be constructed on NC 86. Status as of May 25, <br /> 1997: Cost estimates prepared; exceed spot-safety limits and lack of <br /> other funds, no change. <br /> 3) 1-85 / Old NC 86 (SR 1009) - Requested on Oct. 2, 1995 that the 1-85 <br /> Northbound ramps at Churton Street be signalized ahead of the widening of <br /> 1-85, (now an Identified Future Need and postponed till after 2004). This <br /> project meets warrants for signalization, but no funds available. Status as <br /> of May 25, 1997: No change. <br /> 4) NC 54 / Southern Drive (SR 2016) - Requested on Oct. 2, 1995 that a left <br /> turn lane be constructed on NC 54. Status as of May 25, 1997: No change, <br /> funds not available. <br /> 5) NC 86 / Coleman LP (SR 1332) - Requested on Oct. 2, 1995 that a left <br /> turn lane on NC 86 be constructed. Status as of May 25, 1997: Study <br /> done; lane desirable, but traffic volumes and accident history don't <br /> justify expenditure presently and funds not available. <br /> 6) US 70 Bypass/ Miller Road (SR 1555) - Requested on Oct. 2, 1995 that <br /> left turn lanes be constructed on US 70. Status as of May 25, 1997: Lanes <br /> studied at same time signals installed; cost considerable due to fill <br /> work required; funds not available. <br /> 7) US 70 Bypass/ Lawrence Road (SR 1561) - Requested on Oct. 2, 1995 <br /> that left turn lanes be constructed on US 70. Lanes desirable by NC DOT. <br /> Status as of May 25, 1997: no change, funds not available. <br /> 8) Carr Store Road (SR 1352) / Efland Cedar Grove Road (SR 1004) - <br /> Requested on Oct. 2, 1995 that rumble strips be installed on both Efland <br /> Cedar Grove Road approaches to intersection. Status as of July 17, 1997: <br /> Additional traffic studies performed by NC DOT and no improvements <br /> warranted at this time. <br /> 9) NC 57 / NC 157 (GUESS RD) - Requested Oct., 2, 1995 that both roads <br /> be repaved and that rumble strips be redone and more added. Status as of <br /> May 25, 1997: Rumble strips re-done and 45 MPH advisory signs <br /> installed on NC 57; NC 57 re-paved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.