Browse
Search
Agenda - 10-06-1997 - 8h
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1997
>
Agenda - 10-06-1997
>
Agenda - 10-06-1997 - 8h
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2013 4:48:14 PM
Creation date
8/13/2013 4:48:08 PM
Metadata
Fields
Template:
BOCC
Date
10/6/1997
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8h
Document Relationships
Minutes - 19971006
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1997
RES-1997-051 Resolution of Approval University Manor Phase III Preliminary Plan
(Linked From)
Path:
\Board of County Commissioners\Resolutions\1990-1999\1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
21 <br /> BASS, NIXON & KENNEDY, INC., CONSULTING ENGINEERS <br /> 7416 CHAPEL HILL ROAD, RALEIGH, NC 27607 <br /> 919/851-4422 ■ FAX 919/851-8968 <br /> UNIVERSITY MANOR - STATUS OF COMMUNITY WELL SYSTEM <br /> Well #1 - Drilled March 1996. Yield = 16 gpm. <br /> There is currently no set schedule for putting this well <br /> into service. Well #2 is adequate to serve Phase I. <br /> The water system for Phase I will be connected to the <br /> distribution system for the next phase of University <br /> Manor. Well #1 will be put into service at such time as <br /> the next phase is developed. <br /> Well #2 - Drilled March_1996. Yield = 58 gpm. <br /> Well #2 including 10,000 gallon hydropneumatic tank put <br /> into service ory-April 14, 1997. <br /> Well #3 - Drilled November 1996. Yield = 60 gpm. <br /> No testing done at this point. Will be put into service <br /> with construction of Phase II. <br /> Well #4 - Drilled November 1996. Yield = 30 gpm. <br /> No testing done at this point. Will be put into service <br /> with construction of Phase II. <br />
The URL can be used to link to this page
Your browser does not support the video tag.