Orange County NC Website
20 <br /> 1Rf.Sanford B�. <br /> Page 3 <br /> July 11, 1997 <br /> Acceptance of the Well as a source of puMc water mq*re(lhd =satisfictory'new Well" <br /> bee <br /> Pnor to digmg contact dw Groundwater Section at tbhs Regional Ofte and the County <br /> Health Departnnent coocernig the necessity of the issuance of a well construction permit. Upon <br /> receipt of this leuer and a well Boa permit ffom the appropriate sgenciM you may <br /> proceed with&Sng opara km <br /> After compleft well construction,conduct s 24-hour well yield test folowing the <br /> mpire wo of the Nonh Carolina Wd milatien and Standuds Copies of the <br /> we$construction rec=d,water analysis,2"m well yield test,and three(3)copies of <br /> documents and a debts outlined m the"Guide for Obtaining Approval of Public Water Supply <br /> Systenns"must be wbmitted to the Plan Review Brag.Public water Supply Sectim Division of <br /> Environmental Heahh in Raldgh for review and approval. <br /> We do not allow connecting the well to the water di;trAmum system until the Division of <br /> Environmental Health has reviewed and approved the plsns`and specifications for the well, The <br /> plans and specifications mm be prepared and sealed by an engineer licensed to practice in the <br /> State of North Carolina. Consavction must also be approved by a licensed engineer. <br /> If any additional infoemstion or assistance is needed from this Office,pleas do not <br /> hesitate to cal us at(919).5714700. <br /> Sbtcerely, <br /> Bo=Phelps ` <br /> Brhviroameaeal Technician III <br /> Public water Supply Section <br /> BP:ncp <br /> cc: Mid ad L.Douglas <br /> L C.Lin <br /> Orange County Heath Depa Vw* <br /> TOTAL P.04 <br />