Browse
Search
Agenda - 09-16-1997 - 8n
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1997
>
Agenda - 09-16-1997
>
Agenda - 09-16-1997 - 8n
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2013 2:46:39 PM
Creation date
8/9/2013 2:46:37 PM
Metadata
Fields
Template:
BOCC
Date
9/16/1997
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7n
Document Relationships
Minutes - 19970916
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. <br /> ORANGE COUNTY <br /> BOARD OF COMMISSIONERS <br /> ACTION AGENDA ITEM ABSTRACT <br /> Meeting Date: September 16, 1997 <br /> Action Agenda <br /> Item# A` 3 <br /> SUBJECT: Bicycle Plan Component Advisory Committee <br /> DEPARTMENT: Planning& Inspections PUBLIC HEARING: Yes_X—No <br /> BUDGET AMENDMENT REQUIRED: Yes_X—No <br /> ATTACHMENT(S): INFORMATION CONTACT: Slade McCalip <br /> - 1997-98 BOCC Transportation Planning Goal - Objective 4 Extension 2595 <br /> - Draft Bicycle Advisory Committee Structure <br /> - Draft Bicycle Advisory Committee Charge TELEPHONE NUMBERS: <br /> - Draft Bicycle Plan Component Schedule <br /> Hillsborough - 732-8181 <br /> Durham - 688-7331 <br /> Mebane - 227-2031 <br /> Chapel Hill - 967-9251 <br /> PURPOSE: To consider the structure of a proposed Bicycle Advisory Committee and a charge <br /> and schedule to guide the work of the committee. <br /> BACKGROUND: On August 7, 1997 the Board approved in their 1997-98 BOCC Goals and <br /> Objectives. Objective 4 - Update the Transportation Element of the <br /> Comprehensive Plan, includes the development of a Bicycle Component in the <br /> Transportation Element (see attached copy of Objective 4) of the Comprehensive <br /> Plan. <br /> The purposes for developing a Bicycle Plan Component are: 1) to complete a <br /> recommendation (to develop and adopt local Bicycle Plans) of the 1993 DCHC <br /> Regional Bicycle Plan, and 2)to use the Bicycle Plan Component to develop a list <br /> of bicycle projects for inclusion in the annual Orange County Transportation <br /> Priorities List. <br /> A Bicycle Advisory Committee (BAC) is recommended to insure that the specific <br /> needs of Orange County bicyclists are considered in the development and <br /> implementation of a Bicycle Plan Component. A BAC is also recommended by <br /> the 1993 DCHC Regional Bicycle Plan. Attached is a Draft Bicycle Advisory <br /> Committee Structure which indicates what types of experience would be valuable <br /> for inclusion on a BAC. <br /> Also attached are a: Draft Bicycle Advisory Committee Charge to guide the BAC <br /> in the development of a Bicycle Plan Component and a Draft Bicycle Component <br /> Plan Schedule. <br />
The URL can be used to link to this page
Your browser does not support the video tag.