								      	9.8 The Contractor shall review, approve and submit to the				ARTICLE 10   					c
<br />  	Architect Shop Drawings, Product Data, Samples and similar      	ADMINISTRATION OF THE CONTRACT
<br />  	submittals required by the Contract Documents with reason-
<br />  	able promptness. The Work shall be in accordance with
<br />  	approved submittals. When professional certification of per-      10.1 The Architect will provide administration of the Contract
<br />  	formance criteria of materials,systems or equipment is required      and will be the Owner's representative(1)during construction,
<br />  	by the Contract Documents, the Architect shall be entitled to      (2)until final payment is due and(3)with the Owner's concur-
<br />  	rely upon the accuracy and completeness of such certifications.      rence,from time to time during the correction period described
<br />      										in paragraph 18.1
<br />  	9.9 The Contractor shall keep the premises and surrounding      in P  The Architect will visit the site at intervals appropriate to
<br />  	area free from accumulation of waste materials or rubbish      the stage of construction to become generally familiar with the
<br />  	caused by operations under the Conger.At completion   the      progress and quality of the completed Work and to determine
<br />  	Work the Contractor shall remove from and about the Project ject      in general if the Work is being performed in a manner indicat-
<br />  	waste materials, rubbish, the Contractor's tools, construction      ing that the Work,when completed,will be in accordance with
<br />  	equipment, machinery and surplus materials.  			the Contract Documents. However, the Architect will not be
<br />   	9.10 The Contractor shall provide the Owner and Architect      required to make exhaustive or continuous on-site inspections
<br />   	access to the Work in preparation and progress wherever      to check quality or quantity of the Work. On the basis of on-
<br />   	located.  								site observations as an architect, the Architect will keep the
<br />      										Owner informed of progress of the Work and will endeavor to
<br />   	9.11 The Contractor shall pay all royalties and license fees;      guard the Owner against defects and deficiencies in the Work.
<br />   	shall defend suits or claims for infringement of patent rights and      10.3 The Architect will not have control over or charge of and
<br />   	shall hold the Owner harmless from loss on account thereof,      will not be responsible for construction means,methods,tech-
<br />   	but shall not be responsible for such defense or loss when a
<br />   	particular design, process or product of a particular manufac-	rogram sequences or procedures,or for safety precautions and
<br />      										p
<br />   	turer or manufacturers is required by the Contract Documents      programs in connection with the Work, since these are solely
<br />   	unless the Contractor has reason to believe that there is an      the Contractor's responsibility as provided in Paragraphs 9.1
<br />   	infringement of patent.  						and 16.1.The Architect will not be responsible for the Contrac-
<br />       										tor's failure to carry out the Work in accordance with the Con-
<br />   	9.12 To the fullest extent permitted by law, the Contractor      tract Documents.
<br />   	shall indemnify and hold harmless the Owner,Architect,Archi-      10.4 Based on the Architect's observations and evaluations of
<br />   	tect's consultants, and agents and employees of any of them      the Contractor's Applications for Payment, the Architect will
<br />   	from and against claims,damages,losses and expenses,includ-      review and certify the amounts due the Contractor and will
<br />   	ing but not limited to attorneys'fees,arising out of or resulting      issue Certificates for Payment in such amounts.
<br />   	from performance of the Work,provided that such claim,dam-
<br />   	age, loss or expense is attributable to bodily injury, sickness,      10.5 The Architect will interpret and decide matters concern-
<br />   	disease or death,or to injury to or destruction of tangible prop-      ing performance under and requirements of the Contract Docu-
<br />   	erty(other than the Work itself)including loss of use resulting      ments on written request of either the Owner or Contractor.
<br />   	therefrom,but only to the extent caused in whole or in part by      The Architect will make initial decisions on all claims,disputes
<br />   	negligent acts or omissions of the Contractor,a Subcontractor,      or other matters in question between the Owner and Contrac-
<br />   	anyone directly or indirectly employed by them or anyone for      tor, but will not be liable for results of any interpretations or
<br />   	whose acts they may be liable, regardless of whether or not      decisions rendered in good faith. The Architect's decisions in
<br />   	such claim,damage,loss or expense is caused in part by a party      matters relating to aesthetic effect will be final if consistent with
<br />   	indemnified hereunder.Such obligation shall not be construed      the intent expressed in the Contract Documents.All other deci-
<br />   	to negate, abridge, or reduce other rights or obligations of      sions of the Architect, except those which have been waived
<br />   	idemnity which would otherwise exist as to a party or person      by making or acceptance of final payment, shall be subject to
<br />   	described in this Paragraph 9.12.       				arbitration upon the written demand of either parry.
<br />   	9.12.1  In claims against any person or entity indemnified      10.6 The Architect will have authority to reject Work which
<br />   	under this Paragraph 9.12 by an employee of the Contractor,a      does not conform to the Contract Documents.
<br />   	Subcontractor,anyone directly or indirectly employed by them      10.7 The Architect will review and approve or take other
<br />   	or anyone for whose acts they may be liable, the indemnifica-      appropriate action upon the Contractor's submittals such as
<br />    	tion obligation under this Paragraph 9.12 shall not be limited by      Shop Drawings, Product Data and Samples, but only for the
<br />    	a limitation on amount or type of damages, compensation or      limited purpose of checking for conformance with information
<br />    	benefits payable by or for the Contractor or a Subcontractor      given and the design concept expressed in the Contract
<br />    	under workers' or workmen's compensation acts, disability      Documents.
<br />    	benefit acts or other employee benefit acts.
<br />											10.8 All claims or disputes between the Contractor and the
<br />    	9.12.2 The obligations of the Contractor under this Paragraph       Owner arising out or relating to the Contract, or the breach
<br />    	9.12 shall not extend to the liability of the Architect,the Archi-       thereof,shall be decided by arbitration in accordance with the
<br />    	tect's consultants, and agents and employees of any of them       Construction Industry Arbitration Rules of the American Arbi-
<br />    	arising out of(1)the preparation or approval of maps,drawings,       tration Association currently in effect unless the parties mutu-
<br />    	opinions,  reports,  surveys,  Change  Orders,  Construction       ally agree otherwise and subject to an initial presentation of the
<br />    	Change Directives,designs or specifications,or(2)the giving of      claim or dispute to the Architect as required under Paragraph
<br />    	or the failure to give directions or instructions by the Architect,       10.5.Notice of the demand for arbitration shall be filed in writ-
<br />    	the Architect's consultants,and agents and employees of any of      ing with the other party to this Agreement and with the Ameri-
<br />    	them provided such giving or failure to give is the primary       can Arbitration Association and shall be made within a reason-
<br />    	cause of the injury or damage. 					able time after the dispute has arisen. The award rendered by
<br />       						AIA DOCUMENT A107•ABBREVIATED OWNER-CONTRACTOR AGREEMENT•NINTH EDITION•AIA® •©1987
<br />    	7   A107-1957			THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C. 20006