Browse
Search
Agenda - 09-02-1997 - 9f
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1997
>
Agenda - 09-02-1997
>
Agenda - 09-02-1997 - 9f
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2013 10:36:44 AM
Creation date
8/9/2013 10:36:42 AM
Metadata
Fields
Template:
BOCC
Date
9/2/1997
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
9f
Document Relationships
Minutes - 19970902
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• When we applied <br /> to DOT for the <br /> SHS driveway <br /> permit, DOT <br /> advised us that �• <br /> the left turn lane <br /> was needed and STATE OF NmT H CAR(JUNA <br /> must be built prior DEPARTMENT Of T A tct�i'�NSPORUMON <br /> to the building 1 <br /> being occupied. Ja DIVISION Of HIGI W"s Goa 6.GARR r la <br /> P. o. Box 766 SMARMnr <br /> Graham, North Carolina 2 <br /> 10 February 19 7 e� (,��� <br /> �tE��T ZACK, INsG. f <br /> ORAWN C <br /> Michael Hasp rsley FEB 1 2 19�� <br /> Corley Redfo Zack pp r <br /> P.O. Box 2368 R E C E , V ED <br /> Chapel Hill, C 27515-2368 <br /> 919 942-8586 <br /> Subject: Reque ed Revision for Driveway Permit <br /> Orange County Southern Hunan Services Center <br /> locate off alt 1777 (Homestead Road) <br /> Dear Mr. Hammers eY: <br /> This letter is in response to your request to phase the roadway <br /> improvements alon SR 3777. As stated in your letter. SR 1777 will <br /> be improved by the State under TIP Project U-2805 and for this reason <br /> we agree with the wn of Chapel itt allowing you to phase the <br /> widening of your ex'sting roadway frontage to the Town's required <br /> half of a 51 foot c as-section with curb and gutter, sidewalk and <br /> bike lanes. However, <br /> to nlaae along the <br /> nee <br /> As you know, the Town's approval of your construction plans is <br /> conditional upon you receiving an encroachment and driveway permit <br /> from this office. I am sorry if you misinterpreted the Town's <br /> approval and awarding the contract without receiving all your <br /> permits. However, this oversight will not change the ninimum <br /> requirements for you to provide a turnlane along SR 1777 in <br /> conjunction with your site. <br /> Tf you have any questions or require additional information, <br /> please contact Michael Venable, Assistant district Engineer, <br /> at (910) 570-6833. <br /> sincerely, <br /> Tommy J. rer <br /> DISTRICT ENGINZER <br /> cc: J. W. Watkins, P.E., Division 8ngineer <br /> Town of Chapel Hill I)PR70210-MVI <br /> TOTAL P.02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.