Orange County NC Website
20 <br /> Mr. Samford Bailey <br /> Page 3 <br /> A* 11, 1997 <br /> Acceptance of the well a a source of public water supply requires satisfactory"new well" <br /> inorganic and beam iological analyses. <br /> Prior to drafing contact the Groundwater Section at this Regional Office and the County <br /> Health Dgmu mt concerring the necessity of the issuance of a well construction perrnrit. Upon <br /> receipt of this letter and a well construction permit from the appropriate agencies,you may <br /> Proceed with drft&ope radom <br /> After cig well construction,conduct a 24-hour well yield test following the <br /> regtmanerits of the North Cartifin Well Camo m Re�ilatiofl and Standards_ I Copies of the <br /> wed construction record,water analysis,24-hour weq yidd test,and dm(3)copies of <br /> doeutrmts and alftita outlined in the"Guide for Obtaining Approval of Public Water Supply <br /> SyaaW rnim be submitted to the Phu Review Branch,Public water Supply Section,Division of <br /> F,mrironaaental Health in Raleigh for review and approval. <br /> We do not allow cormecft the well to the water distribution"an until the Division of <br /> B whotmm- Health has reviewed and approved the pians`,and specifications for the well. The <br /> plans and spadgc lions ram be prepared and salad by an aiginew licerised to practice in the <br /> State of North Carolina. Construction must also be approved by a licensed exiginea. <br /> If my additional information or assistance is needed from this Office, please do not <br /> hesitate to caB us at(919)571-4700. <br /> Sotcere>lr. <br /> Brm Phelps <br /> Bnviroaaaritai Technician III <br /> Public Water Supply Section <br /> BP:ncp <br /> cc: Michael L Douglas <br /> 1. C. Lin <br /> Orange County HeattA Deparmoeent <br /> TOTAL P.04 <br />