Browse
Search
Agenda - 08-25-1997 - E1c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1997
>
Agenda - 08-25-1997
>
Agenda - 08-25-1997 - E1c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2013 10:18:32 AM
Creation date
8/8/2013 10:18:29 AM
Metadata
Fields
Template:
BOCC
Date
8/20/1997
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
E-1c
Document Relationships
Minutes - 19970825
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INCDOT/P&E BRANCH Fax:919-733-9794 Aug 4 '97 9:23 P.04 13 . <br /> July 7, 1997 <br /> MEMORANDUM TO: File <br /> FROM: Missy Dickens,PE,Project Planning Engineer <br /> Planning and Environmental Branch <br /> SUBJECT: Citizens Informational Workshop Minutes for Homesteadl <br /> Road(SR 1777),From High School Road(SR 1934)i to <br /> NC 86,Chapel Hill,Orange County,Federal Aid Project i <br /> STP-1777(1),State Project 8.2501101,TIP Project Lf 2805 <br /> A Citizens Infonnational Workshop for the subject project was held on June 25. <br /> 1997 from 4:00 to 7:00 p.m.in the Council Chambers of the Chapel Hill Town Half. <br /> Approximately 35 citizens attended NCDOT staff in attendance included: Julie i <br /> Hunkins,Missy Dickens,Neil Dean,and Yvonne GoldM&of Planning and I <br /> Environmental;Henry Moon of Division 7 Right of Way Office;Mike Cowan of the <br /> Division 7 Office;and Todd Dudley of the Citizens Participation Unit. <br /> The handout stated that proposed improvements included widening to a three-large <br /> shoulder section with four-foot paved shoulders to be used by bicycles. The aerial <br /> photograph mosaic which was displayed showed northside,symmetrical,and"de 1 <br /> construction limits,each 36 meters(120 feet)wide(including 30 meters[100 feet)of <br /> right of way plus up to 3 meters 110 feet]of casement on each side. In verbal discu�sions: <br /> with citizens,NCDOT staff mentioned that five-lane wideeniag now was a viable <br /> alternative. <br /> Recurring issues included the desire for sidewalks and bicycle facilities. Some <br /> People expressed the opinion that the widening was not needed,while others seemed to <br /> support a five-lane widening when they realized that would enable the construction�f <br /> sidewalks and would require the same amount of additional right of way. Furdmm�ce, <br /> many people expressed desire concerning impacts to their particular property or <br /> subdivision Comment sheets in the project file provide more specific information <br /> regarding these comments. <br /> CC. Kathy Lassiter,PE <br /> Glenda Gibson,PE <br /> Julie Hankins,PE <br /> Missy Dickens,PE <br />
The URL can be used to link to this page
Your browser does not support the video tag.