Browse
Search
RES-1997-037a Resolution of Approval Oxbow Crossing on Morgan Creek
OrangeCountyNC
>
Board of County Commissioners
>
Resolutions
>
1990-1999
>
1997
>
RES-1997-037a Resolution of Approval Oxbow Crossing on Morgan Creek
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2013 8:42:31 AM
Creation date
8/6/2013 12:44:34 PM
Metadata
Fields
Template:
BOCC
Date
8/4/1997
Meeting Type
Regular Meeting
Document Type
Resolution
Agenda Item
8j
Document Relationships
Agenda - 08-04-1997 - 8j
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\1990's\1997\Agenda - 08-04-1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br /> A letter of credit or escrow agreement or other security shall be submitted to secure construction <br /> of Oxbow Crossing Road and Oconee and Galax Courts to NCDOT standards. An estimate of <br /> the construction cost must be prepared by a certified/licensed engineer or grading contractor and <br /> submitted to the Orange County Planning Department. The financial guarantee must reflect 110 <br /> percent of that estimate and be issued by an accredited financial institution licensed to do <br /> business in North Carolina. <br /> The document describing development restrictions to be recorded with the Final Plat shall state <br /> that the financial guarantee will not be released until the road construction has been inspected <br /> and approved by NCDOT. <br /> 2. An erosion control plan for construction of the roads shall be submitted by the <br /> applicant to the Orange County Erosion Control Division for review and approval. <br /> 3. Approved street name signs shall be erected at all intersections, as required in <br /> Section IV-B-3-c-12 of the Orange County Subdivision Regulations. The <br /> applicant shall submit evidence that signs are in place, or a receipt for purchase of <br /> signs shall be submitted to the Planning Department. <br /> 4. Access to all lots shall be from interior streets only. No lots shall have direct <br /> driveway access onto Bethel-Hickory Grove Church Road. <br /> C. Land Use Buffers and Landscaping <br /> 1. Landscaping shall be installed or preserved as indicated on the approved <br /> landscape plan,and must be inspected and approved by the Planning Department. <br /> 2. Provisions for protection of existing trees as shown on the approved landscape <br /> plan shall be included in a document describing development restrictions and <br /> requirements to be prepared by Planning Staff and recorded concurrently with the <br /> Final Plat. <br /> D. Drainage <br /> 1. Impervious surface data,pursuant to Article 6.23 of the Zoning Ordinance, shall <br /> be included in the development restrictions and requirements document to be <br /> prepared by Planning Staff and recorded concurrently with the Final Plat. <br /> 2. Drainage easements as required shall be located following review and approval of <br /> the Erosion Control Plan. <br /> 3. A Stream buffer as proposed on the Preliminary Plat shall be contained entirely <br /> within the open space area indicated on the Preliminary Plan. The width will <br /> range from 70 to 155 feet beyond the 100-year flood line, depending upon <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.