Browse
Search
Agenda - 08-04-1997 - 8m
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1997
>
Agenda - 08-04-1997
>
Agenda - 08-04-1997 - 8m
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2013 10:24:56 AM
Creation date
8/5/2013 10:24:53 AM
Metadata
Fields
Template:
BOCC
Date
8/4/1997
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8m
Document Relationships
Minutes - 19970804
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1997
NS ORD-1997-020 Zoning Orrdinance Text Amendment - EDD Design Manual Article 2.1 and Article 3.3
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 1990-1999\1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i , <br /> 3 <br /> PROPOSED ORDINANCE AMENDMENT <br /> ORDINANCE: ZONING ORDINANCE <br /> Economic Development Districts Design Manual <br /> REFERENCE: Article 2.1 - Development Areas <br /> Article 3.3 - Circulation and Parking <br /> ORIGIN OF AMENDMENT: Staff Planning Board <br /> X BOCC Public <br /> Other: <br /> STAFF PRIORITY RECOMMENDATION: _X_High Middle Low <br /> Comment: <br /> PUBLIC HEARING DATE: May 27, 1997 <br /> PURPOSE: <br /> To eliminate references to an extension of NC 751 between U.S. 70 and I-85 in the Economic <br /> Development Districts Design Manual. <br /> IMPACTS AND ISSUES: <br /> On March 18, 1997, the Board of Commissioners adopted a Resolution requesting deletion of the NC <br /> 751 connector between US 70 and I-85 from the Durham-Chapel Hill-Carrboro (DCHC) Urban Area <br /> Thoroughfare Plan. The connector is referenced in maps and text pertaining to the I-85/U.S. Hwy. 70 <br /> Economic Development District (EDD). The proposed amendment eliminates all references to the NC <br /> 751 connector in the EDD Design Manual. <br /> PROPOSED AMENDMENT: <br /> Article 2.1 - Development Areas <br /> I-851U.S.Highway 70 District <br /> The I-851U.S. Highway 70 Economic Development District extends almost two miles <br /> along either side of 1-85 and is located in the Lower Eno River Watershed........ <br /> Access to all sites is generally available from U.S. Highway 70, but steep slopes <br /> adjacent to some portions of the roadway may make access more difficult. However, <br /> with the realignment of Mount Herman Church Road as part of the I-85 widening <br />
The URL can be used to link to this page
Your browser does not support the video tag.