Orange County NC Website
Proposal for Geotechnical Services,Phase 1 ESA and Database Review <br /> 2.57 Acres Site- <br /> Highway U.S.70A and Meadowland Drive,Hillsborough,North Carolina <br /> ECS Proposal Number 06P:16687-16689 <br /> Task 3 - Database Review <br /> To determine potential impacts to historic/architectural resources, and archaeological resources, <br /> an ECS scientist will review the following databases: <br /> 1) Review the North Carolina State Historic Preservation Office's (SHPO) Database for <br /> previously documented occurrences of protected historic and/or architectural resources <br /> either on or within the vicinity of the site. <br /> 2) Review the North Carolina State Archaeological Office's (SAO) Database for previously <br /> documented occurrences of archaeological resources either on or within the vicinity of <br /> the project site. <br /> 3) Prepare a Letter Report that summarizes the findings of sub-tasks (1 — 3) above and, if <br /> either rare species/suitable habitat or important historic/archaeological resources occur <br /> on the site, recommend measures for impact avoidance, minimization, and mitigation. <br /> FEE ESTIMATE <br /> Task 1 - Geotechnical Exploration <br /> Based on the scope of services and drilling quantities outlined in this proposal, we have <br /> estimated the fee to perform our services as follows: <br /> Service Descriptions Units Rates Service Fees <br /> Field Exploration: <br /> Private Utility Locator, lump sum - $ 600.00 if required <br /> Drill Rig Mobilization (Truck), lump sum 1 $ 450.00 $ 450.00 <br /> Drilling Borings(0'-50'Ca) <50 bpf), per linear foot 45 $ 11.00 $ 495.00 <br /> Access Delays/Standby Time, per hour - $ 140.00 if required <br /> Total Field Exploration: $ 945.00 <br /> Engineering Services <br /> Boring Layout and Utility Clearance, lump sum 1 $ 75.00 $ 75.00 <br /> Visual Classifications, per sample 15 $ 3.00 $ 45.00 <br /> Report Preparation, Drafting, Administrative, lump sum 1 $ 800.00 $ 800.00 <br /> Total Engineering Services $ 920.00 <br /> TOTAL ESTIMATE OF SERVICES: $ 1,865.00 <br /> The above fees and our schedule assume that the site is accessible to our truck-mounted <br /> drilling equipment with no hand and dozer clearing. It also assumes that we have full access to <br /> the site and are not required to encounter standby time or wait on others to gain access to our <br /> drilling locations. If these problems are encountered, you will be charged the additional time plus <br /> the additional charges in accordance to our attached Fee Schedule. <br /> Provided conditions are as understood, and as assumed, we would expect the final costs to be <br /> as outlined above. Should conditions, sampling results or observations indicate that additional <br /> work is necessary or warranted, we would notify you of the additional costs before modifying or <br /> expanding the extent of our scope of services. If other items are required based on field <br /> conditions encountered in our field exploration program, they would be invoiced in accordance <br /> 3 <br />