Browse
Search
2013-263 AMS - ECS Carolinas, LLP -Facilities Assessment, Due Diligence & Space Needs Analysis Consulting Services $18,500
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2013
>
2013-263 AMS - ECS Carolinas, LLP -Facilities Assessment, Due Diligence & Space Needs Analysis Consulting Services $18,500
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2013 11:59:28 AM
Creation date
7/30/2013 11:59:25 AM
Metadata
Fields
Template:
BOCC
Date
7/29/2013
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Mgr Signed
Document Relationships
R 2013-263 AMS - ECS Carolinas, LLP -Facilities Assessment, Due Diligence & Space Needs Analysis Consulting Services $18,500
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase 3— Financial Analysis <br /> Activity 3.1 <br /> Based upon the current documentation ECS will provide an outline or flow chart to allow <br /> Orange County to determine the relative efficiency of their current facility structure as it <br /> pertains to cost per square foot or cost per employee. <br /> Output <br /> The result of this phase is a report with our outline on how to determine costs by utilizing a <br /> flow chart that is repeatable by Orange County staff with new or future data <br /> FEES/COST OF SERVICES <br /> Not to Exceed Budget based on the rate schedule, below .........................$18,500.00 <br /> Senior Principal Engineer/Consultant..................................................$150.00/hour <br /> Principal Engineer................................................................................$125.00/hour <br /> Senior Professional Engineer..............................................................$115.00/hour <br /> Project Engineer/Manager...................................................................$85.00/hour <br /> SCHEDULE OF WORK <br /> ECS will schedule the field work within one week of acceptance of this proposal. ECS will be <br /> granted unrestricted access to the property. If there is significant standby time or a return trip is <br /> required to complete field work due to access limitations, there will be additional charges. The <br /> final report will be provided approximately one week after the field work is completed. In order <br /> to maintain this schedule, it is critical that we receive your written authorization, special <br /> instructions and distribution list in a timely manner. <br /> AUTHORIZATION <br /> If the above scope of work is acceptable to you, please sign the Proposal Acceptance Form and <br /> return one copy of the proposal acceptance form to us. Please note that the attached Terms <br /> and Conditions of Service are incorporated herein by reference and are an integral part of this <br /> agreement between us. Alternatively, you could issue a letter of acceptance or purchase order; <br /> but we would ask that you reference and include our proposal by reference showing proposal <br /> number and date. <br /> Using the Proposal Acceptance Form will provide formal authorization for us to perform the <br /> above work, enter the site, and provide proper invoicing instructions and distribution lists for <br /> reports and correspondence. Please provide any specific instructions or details not covered in <br /> this proposal on the attached Proposal Acceptance Form. Please note that we have provided a <br /> place to provide invoicing instructions and report distribution. In today's times with improved <br /> technology, and to provide you with the fastest response, we normally provide the reports by e- <br /> mail. If this is acceptable, then list those to whom the reports should be sent and provide their e- <br /> mail addresses, if appropriate, on the Proposal Acceptance Form. <br />
The URL can be used to link to this page
Your browser does not support the video tag.