Browse
Search
1997 S Purchasing - Blythe Constructionf for Public Works Paving Project
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
1990's
>
1997
>
1997 S Purchasing - Blythe Constructionf for Public Works Paving Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2013 4:19:36 PM
Creation date
7/26/2013 4:18:07 PM
Metadata
Fields
Template:
BOCC
Date
6/2/1997
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
9e
Document Relationships
Agenda - 06-02-1997 - 9e
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\1990's\1997\Agenda - 06-02-1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. Acceptance and Final Payment: Upon submission by the Contractor of evidence satisfactory to <br /> thet`omrtythat all payrclls,'ma r al bills, and other costs incurred by the Contractor in connection with <br /> the-,wn&tfu on of the work have been paid in full, final payment on account of the Contract shall be made <br /> within thirty (30) days after the completion by the Contract of all work covered by Contract and the <br /> acceptance of such work by the County. <br /> 7. Liquidated Damages: It is mutually agreed between the parties that time is of the essence in the <br /> completion of this Contract and there will be, on the part of the County, substantial monetary damage in <br /> the event that the Contractor should fail to complete the work the work within the time fixed for <br /> completion in the Contract or within the time to which such completion may have been extended. <br /> Liquidated damages in the amount as indicated in the Supplemental General Provisions will be deducted <br /> and retained out of the monies which may become due the Contractor for every calendar day the time of <br /> work exceeds the Contract Time as stipulated In the Supplemental General Provisions. <br /> 8. Responsibility of Contractor: In addition to the General Conditions, which are made a part of <br /> this Contract, it is further weed that in all operations connected with this Contract, the Contractor shall be <br /> held responsible for any failure to adhere to and comply with all local ordinances and laws controlling in <br /> any way the actions of those engaged upon the work, or affecting any materials, transportation or <br /> disposition of same. The Contractor agrees to assume all liability for and to indemnify the County against <br /> any losses, costs, damages and liabilities that may arise by reason of any liens, claims, or demands for either <br /> material purchased or for work performed by laborers, mechanics and others and from any damages, <br /> claims, costs, actions or causes of action and judgment that may arise from personal injuries or property <br /> damages sustained by mechanics, laborers, or any person or persons by reason of accidents or otherwise, <br /> occurring through the neglect or carelessness of the Contractor, his agents employees or workmen and any <br /> subcontractor and from damages to the public, injury of any person, Corporation, etc., including any cost <br /> of defense, sustained by depositing materials. The Contractor shall be notified of the bringing of suits in <br /> such cases and be permitted to defend same by his own counsel. The Contractor and shall hold harmless <br /> the County from all liabilities, claims,judgments, costs and expenses which may in any manner arise against <br /> the County in consequence of the granting of this Contract, or which in any way may result from the <br /> carelessness or neglect of the Contractor, his agents, servants, or employees, and any subcontractor. <br /> 9. Guarantee: It is understood that the Contractor guarantees all material and workmanship for a <br /> period of one (1) year dating from the date if the final acceptance of the Contract. <br /> C-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.