Orange County NC Website
I <br /> §3.4.18 Providing services after issuance to the Owner of the final Certificate for Payment,or in the absence of a final <br /> Certificate for Payment,more than 60 days after the date of Substantial Completion of the Work. <br /> §3.4:19 Providing services of consultants for other than architectural,structural,mechanical and electrical engineering <br /> portions of the Project provided as a part of Basic Services. <br /> §3.4:20 Providing any other services not otherwise included in this Agreement or not customarily furnished in <br /> 'a 6tdance with generally accepted architectural practice. <br /> ARTICLE 4 OWNER'S RESPONSIBILITIES <br /> P-.1 The Owner shall provide full information in a timely manner regarding requirements for and limitations on the <br /> Project,including a written program which shall set forth the Owner's objectives,schedule,constraints and criteria, <br /> including space requirements and relationships,flexibility,expandability, special equipment,systems and site <br /> requirements.The Owner shall furnish to the Architect,within 15 days after receipt of a written request,information <br /> necessary and relevant for the Architect to evaluate,give notice of or enforce lien rights. <br /> §42 The Owner shall establish_and periodically update an overall budget for the Project,including the Construction <br /> Cost,the Owner's other costs and reasonable contingencies related to all of these costs. <br /> §4.3 wnershall designate a representative authorized to act on the Owner's behalf with respect to the Project.The <br /> Owner or such designated representative shall render decisions in a timely manner pertaining to documents submitted <br /> by the Archilectl in order to avoid unreasonable delay in the orderly and sequential progress of the Architect's services. <br /> §4.4 The Owner shah furnish sure eys to describe physical characteristics,legal limitations and utility locations for the <br /> site of the Project,and a written legal description of the site. surveys and legal information shall include,as <br /> applicable,grades and lines of streets, alleys,pavements and adjoining property and structures; adjacent drainage; <br /> rights-of-way,restrictions,easements,encroachments,zoning,deed restrictions,boundaries and contours of the site; <br /> locations,dimensions and necessary data with respect to existing buildings,other improvements and trees;and <br /> information concerning available utility services and lines,both public and private, above and below grade,including <br /> inverts and11&vths.All th�lnformation on the survey shall be referenced to a Project benchmark. <br /> §4.5 The Owner shall furnish the services of geotechnical engineers when such services are requested by the Architect. <br /> Such servicesmay include but are not limited to test borings,test pits,determinations of soil bearing values,percolation <br /> Pests;evaluations of hazardous materials,ground corrosion tests and resistivity tests,including necessary operations for <br /> anticipating subsoil conditions, with reports and appropriate recommendations. <br /> §4.6 The Owner shall furnishh the services of consultants other than those designated in Section 4.5 when such services <br /> are requested by the Architect and are reasonably required by the scope of the Project. <br /> § <br /> 4.7 The Owner shall furnish structural,mechanical,and chemical tests;tests for air and water pollution;tests for <br /> hazardous materials; and other laboratory and environmental tests,inspections and reports required by law or the <br /> Contract Documents. <br /> §4:8 The Owner shall furnish all legal,accounting and insurance services that may be necessary at any for the <br /> Project to meet the Owner's needs and interests. Such services shall include auditing services the Owner may require to <br /> verify the Contractor's Applications for Payment or to ascertain how or for what purposes the Contractor has used the <br /> money paid by or on behalf of the Owner. <br /> §4.9 The services,information,surveys and reports required by Sections 4.4 through 4.8 shall be..furnished at the <br /> Owner's expense,and the Architect shall be entitled to rely upon the accuracy and completeness thereof. <br /> §4.110 The Owner shall provide prompt written notice to the Architect if the Owner becomes aware of any fault or defect <br /> in,ttie Project including any errors,omissions or inconsistencies in the Architect's:Instruments of Service. <br /> AIA Document B151 TM-1997.Copyright @ 1974,1978,1987,and 1997 by The American Institute of Architects.All rights reserved.WARNING:This <br /> AIA®Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA®Document, 7 <br /> or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. <br /> Purchasers are permitted to reproduce ten(10)copies of this document when completed.To report copyright violations of AIA Contract Documents,e-mail <br /> The American Institute of Architects'legal counsel,copyright @aia.org. <br />