Browse
Search
2010-031c AMS - Corley, Redfoot and Zack Link remodeling contract
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2010
>
2010-031c AMS - Corley, Redfoot and Zack Link remodeling contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2018 8:19:15 AM
Creation date
7/25/2013 10:14:31 AM
Metadata
Fields
Template:
Contract
Date
12/8/2009
Contract Starting Date
2/10/2010
Contract Ending Date
12/31/2010
Contract Document Type
Agreement - Construction
Amount
$61,300.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
§3.3.6 Providing services made necessary by the default of the Contractor,by major defects or deficiencies in the Work <br /> of the Contractor,or by failure of performance of either the Owner or Contractor under the Contract for Construction. <br /> §3.3.7, Providing services in evaluating an extensive number of claims submitted by the Contractor or others in <br /> connection with the Work. <br /> §3.3.8 Providing services in connection with a public hearing,a dispute resolution proceeding or a legal proceeding <br /> excepf"ere the Architect is party thereto. <br /> §3.3.9 Preparing documents for alternate,separate or sequential bids or providing services in connection with bidding, <br /> negotiation or construction <br /> ;prior to the completion of the Construction Documents Phase. <br /> §I114 OPTIONAL ADDITIONiA1 SERVICES <br /> 3.4.1 Providing analyses of the Owner's needs and programming the requirements of the Project. <br /> - <br /> §3.4.2 Providing fina vial feasibility or other special studies. <br /> su dks site evaluations or comparative studies of prospective sites. <br /> . . . ; . P P p <br /> ��§3 4 3 PFFrourdmg plannling rul y , <br /> §� 3.4.4 Pro idi ecia sur 'ellll l��i'�� environmental studies and submissions required for royals of governmental <br /> asp Y , q approvals g <br /> on than ha�risdiction over the Project. <br /> §3.4.5 Provi°idirig service MlaWe to future facilities, systems and equipment. <br /> vi sling serylices to investigate existing conditions or facilities or to make measured drawings thereof. <br /> §3 4 7Prbviding ser llll'Itces toll lerify the accuracy of drawings or other information furnished by the Owner. <br /> §3i 4 8 Providing eoordinAIllll1ii of construction performed by separate contractors or by the'Owner s own forces and <br /> coordination of service;rec�liured m connection with construction performed and equipment supplied by the Owner. <br /> q <br /> Providing services in connection with the work of a construction manager or separate consultants retained by the <br /> 3.4:1aProvidin IIIldetailed estimates of Construction Cost. <br /> §3.4.1 1 IProvidi, detailed quantity surveys or inventories of material,equipment and labor. <br /> li l <br /> §34.12 1,Providin Ig� analyses of owning inn and operating costs. <br /> § <br /> x,4.13 Providiiil� Illlinterior design other similar services required for or in connection with the selection g g q <br /> procurement or installation of furniture,furnishings and related equipment. <br /> - <br /> §3.4.15 Making investigations,inventories of materials or equipment,or valuations and detailed appraisals of existing <br /> faclities. <br /> §3.4.16 Preparing a set of reproducible record drawings showing significant changes in the Work made daring <br /> construction based on marked-up prints,drawings and other data furnished by the Contractor to the Architect. <br /> §'3 4111;1IH7!Providing assistance m the utilization of equipment or systems such as testing,adjusting and balancing, <br /> I'llll <br /> .preparation of operation and maintenance manuals,training personnel for operation and maintenance,and consu ltation <br /> during'loperation. <br /> AIA Document B151TM-1997.Copyright©1974,1978,1987,and 1997 by The American Institute of Architects.All rights reserved.WARNING:This <br /> Ale Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this Ale Document, 6 <br /> or any portion of it,may result severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. <br /> Purchasers are permitted to reproduce ten(10)copies of this document when completed.To report copyright violations of AIA'Contract Documents,e-mail <br /> The American Institute of Architects'legal counsel,copyright @aia.org. <br />
The URL can be used to link to this page
Your browser does not support the video tag.