Browse
Search
2010-031 AMS - Corley, Redfoot and Zack Link Contract
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2010
>
2010-031 AMS - Corley, Redfoot and Zack Link Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2018 8:17:41 AM
Creation date
7/25/2013 10:11:10 AM
Metadata
Fields
Template:
Contract
Date
12/8/2009
Contract Starting Date
2/16/2010
Contract Ending Date
12/31/2010
Contract Document Type
Agreement - Construction
Amount
$61,300.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AIA Document B151-1997 page 16 <br /> Phase II-John M. Link,Jr.,Building Renovation <br /> AR'T'ICLE 12 O'T'HER CONDITIONS OR SERVICES <br /> 12.1 The Designer's ability to adhere to the schedule proposed by the Owner is predicated upon <br /> timely receipt of reviews and approvals from the Owner,authorized agencies or agents of the <br /> Owner,consultants or contractor hired by the Owner and local or state agencies having <br /> jurisdiction over the project. It is CRZ's understanding that a proposed completion date in the <br /> fourth quarter of 2010 is anticipated. <br /> 12.2 CONSTRUCTION PHASE: <br /> During the construction phase of the work,the term"INSPECTION" shall be defined as follows: <br /> "Inspection shall consist of visual observations of materials,equipment or construction work for <br /> the purpose of ascertaining that the work is in substantial conformance with the Contract <br /> Documents and with the design intent. Others shall not rely upon such inspection as <br /> acceptance of the work,nor should it be construed to relieve the Contractor in any way from <br /> the obligations and responsibilities the Contractor assumes under the construction contract. <br /> Specifically,but without limitation,inspection by the Design Professional shall not require the <br /> Design Professional to assume responsibilities for the means and methods of construction,nor <br /> for safety on the jobsite." <br /> Add the following paragraph to Article 2.6.5: <br /> "Site visits shall be made weekly,for the estimated seven(7)-month construction period and are <br /> included under Basic Services. If additional trips are required for whatever reason,these trips <br /> shall be deemed as Additional Services and will be billed at hourly rates (see 11.3.1). If the <br /> completion date of the project is extended,Additional Services will be billed at hourly rates." <br /> 12.3 Services not included: <br /> a. Printing,postage,reproduction (billed at cost) <br /> b. Topographic or boundary surveys <br /> C. Subsurface investigation,soil,concrete and soil testing during construction <br /> d. Legal fees <br /> e. Renderings or models <br /> f. Off-site utility design <br /> g. Town permitting or approval process fees. <br /> h. Revising design and details for reduction of cost as required by the Owner or Contractor <br /> after each phase of design has been started or completed. <br /> - " <br /> j. Mileage @$0.55/mile. x <br /> Link-con12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.