Browse
Search
Agenda - 05-27-1997 - C2a(5)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1997
>
Agenda - 05-27-1997
>
Agenda - 05-27-1997 - C2a(5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2013 4:41:59 PM
Creation date
7/23/2013 4:41:56 PM
Metadata
Fields
Template:
BOCC
Date
5/27/1997
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C 2a5
Document Relationships
Minutes - 19970527
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> PROPOSED AMENDMENT: <br /> 08, <br /> . <br /> Article 2.3 - Land Use Intensity <br /> Minimum Required Site Volume Ratios (page 2.3.10) <br /> NEOU3 M REQUIRED SITE VOLUME RATIOS* <br /> Required SVR <br /> Land Use Primary,Primary I, <br /> and Secondary Areas Primary II Areas <br /> Residential 2.0 3.0 <br /> • 14 3-9 <br /> SepwieeERet 4-8 2 8 <br /> Flo* pase 4-4 8 <br /> DisvibutiefbAYeFohease 3-9 4A <br /> iff"Swift} 4 A <br /> Agriculture. Forestry and Fishing 1.0 21 <br /> Construction 1.Q 2.4 <br /> Manufacturing,Assembly and Processing* LQ 2.4 <br /> Tran=rration Communication and Utilities ,Q 1Q <br /> Wholesale Trade .Q <br /> Retail Trade LQ 2.a <br /> Finance,Insura_nce and Real Estate 1.Q a <br /> Services 1& 251 <br /> Government 21 M <br /> Other 2,2 21 <br /> *"Manufacturing,Assembly jwd Processing" is Wically referred to as"industrial use".The intensity of impacts <br /> of such use depends on the nature of the specific activity.For example,electronics assembly would be <br /> considered an industrial use,but would have little potential for pollution,high water use or other impacts which <br /> are often perceived as being associated with industrial activity. <br /> With the exception of residential uses,the site volume ratios were selected after an intensive <br /> study of the design features and land use intensity ratios of eighteen selected sites in the <br /> Research Triangle and Piedmont Triad regions. :P stWy kwelved at lemt ue@�OFfl <br /> e8eh ef the land use id t-jhe ratios established above are representative of the <br /> average SVR for each category. <br />
The URL can be used to link to this page
Your browser does not support the video tag.