Orange County NC Website
24 <br /> 2111197 Final Draft Page 19 <br /> groundwater, and sediment on site. The monitoring program shall include the <br /> following: <br /> a. Base Line and Construction Monitoring. <br /> (1) Base line monitoring shall be conducted for the three consecutive <br /> months immediately prior to commencement of construction of any <br /> component of the golf course development; <br /> (2) A minimum of three (3) surface water sample stations will be <br /> established. A minimum of three (3)ground water wells will be <br /> installed. A minimum of one (1) sediment sample station will be <br /> established; and <br /> (3) Parameters for sampling shall be as provided in 8.8.7.6c below. <br /> (4) During construction of the golf course, obtain quarterly samples from <br /> the same stations required in 8.8.7.6a(2) above; <br /> b. Operations Monitoring <br /> (1) The same stations required in 8.8.7.6a(2) above shall be used to <br /> monitor operation of the golf course; <br /> (2)A minimum of three(3) samples will be taken at each of the surface <br /> water sample locations, two (2) groundwater samples at each of the <br /> ground water sample locations, and one (1) sediment sample will be <br /> taken; <br /> (3)Monitoring will continue on a quarterly schedule for a period of three <br /> years from the start of golf course operations. After three years, <br /> monitoring may be reduced to two times per year for surface and <br /> groundwater. The three-year period may be extended if pollutant levels <br /> exceed thresholds established by U.S. Environmental Protection <br /> Agency health advisory limits (HAL) and/or standards set by the North <br /> Carolina Department of Environment,Health and Natural Resources; <br /> and <br /> (4) Parameters for sampling shall be as provided in 8.8.7.6c below. <br /> C. Parameters for Sample Testing <br />