Orange County NC Website
20 <br /> 2111197 Final Draft Page 15 <br /> (1) An assessment of the ecological value of resources that will be lost <br /> and a statement of how that value will be replaced through <br /> mitigation; <br /> (2) A specific statement of the goals and objectives, i.e., exactly what <br /> steps will be taken to compensate for lost habitat, etc.; <br /> (3) Detailed descriptions in the form of grading plans, construction <br /> plans, and planting plans to illustrate how the objectives will be <br /> carried out; <br /> (4) A monitoring and maintenance plan to measure success of the <br /> mitigation based on stated objectives. Include a list of parties <br /> responsible for monitoring and maintenance, a schedule for each, <br /> and how results will be reported at least twice a year to the Planning <br /> and Inspections Department; <br /> (5) A plan showing how the site will be protected from impacts by <br /> human and unwanted animal intrusion, alternate plant species and <br /> construction methods that could be used in the event adjustments or <br /> substitutions are needed until the mitigation area is established; and <br /> (6) A financial guarantee is required for the total cost of the mitigation <br /> project. Once the installation is complete, thirty percent(30%) of the <br /> amount of the bond,letter of credit, or escrow will be held for twelve <br /> (12)months or until the site is established,whichever is greater. <br /> 8.8.7.4 Construction <br /> a. Drainage <br /> (1) All drainage structures shall be installed and maintained according to <br /> the approved Stormwater Management Plan. <br /> (2) Golf courses that include retention/detention ponds shall comply <br /> with the requirements in Article 6.23.4, Operation and Maintenance <br /> of Structural Best Management Practices. <br /> b. Grading and Erosion Control <br />