Browse
Search
Agenda - 05-06-1997 - 1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1997
>
Agenda - 05-06-1997
>
Agenda - 05-06-1997 - 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2013 9:50:51 AM
Creation date
7/22/2013 9:50:48 AM
Metadata
Fields
Template:
BOCC
Date
5/6/1997
Meeting Type
Schools
Document Type
Agenda
Agenda Item
1
Document Relationships
Minutes - 19970506
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16 <br /> standards for the Basic School includes a dining area of 3,300 square feet and a <br /> kitchen/serving area of 1,940 square feet. <br /> 12. Miscellaneous/Commons Basic School - 3,400 sq. ft. <br /> Tier B - Add 1,855 sq. ft. <br /> This area includes miscellaneous space such as additional storage, receiving area, book <br /> storage and School Commons area. <br /> Local Standards (Sq. Ft) NC Public School Facility <br /> Standards (Sq. Ft). <br /> Receiving Area 200 <br /> Custodial/Book 900 <br /> Storage <br /> Book Storage 800 <br /> Student Commons 1,500 1,500 <br /> Tier B includes a larger activities lobby (500 sq. ft.) and three academic house centrums <br /> at 1,000 square feet each(total 3,500 sq. ft.). <br /> 13. Circulation <br /> A multiplier of 35 percent is included for space such as storage, mechanical rooms, <br /> hallways, toilets, walls, etc. The multiplier is applied to the total square footage of the <br /> Basic School plus each additional level. A larger circulation factor than the factor used <br /> for an elementary school is necessary for a middle school due to the more complex nature <br /> of the facility (laboratories, additional plumbing, etc,) and additional space needed for the <br /> hallways (student lockers). <br /> 14. Cost Per Square Foot <br /> For planning purposes a cost of$95 per square.loot for construction is to be used. <br /> Other Facility Considerations <br /> Technology <br /> Technology for new school construction projects should include funds for the installation of <br /> cabling network within the school. The network should be designed to accommodate voice, data <br /> and video educational requirements. Realizing that specifics for the technology infrastructure <br /> Page 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.