Orange County NC Website
Corridor Open Space Master Plan, the Land Use Element of the Comprehensive Plan, <br /> and the Joint Planning Land Use Plan through the proper and customary procedures, and <br /> 3. The Board directs the Orange County Planning Board to adhere, as much as possible, to <br /> the following schedule in the deletion of all mention of the NC 751 Connector in the EDD <br /> Design Guidelines: Present an amendment for Board of Commissioners decision on <br /> August 4, 1997, and <br /> 4. The Board directs the Orange County Planning Board to adhere, as much as possible, to <br /> the following schedule in the deletion of all mention of the NC 751 Connector in all <br /> thoroughfare, bicycle, and pedestrian plans: Present an update of the Transportation <br /> Element of the Comprehensive Plan for the Board of Commissioners decision in <br /> February, 1998, and <br /> 5. If it is necessary as a result of plans being amended and adopted by the Board to delete <br /> references to the NC 751 Connector, the Board directs the Planning Board to develop <br /> Comprehensive Plan Amendments to insure that all references to the NC 751 Connector <br /> are deleted from the maps and texts of all adopted and/or pertinent plans for Orange <br /> County, and <br /> 6. The Board directs that in the future no proposed Orange County plans will include the <br /> addition of the NC 751 Connector. <br /> This, the 5th day of May, 1997. <br /> L,� <br /> William L. Crowther, Chair <br /> Orange County Board of Commissioners <br />