Browse
Search
Agenda - 05-05-1997 - 10b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1997
>
Agenda - 05-05-1997
>
Agenda - 05-05-1997 - 10b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2013 8:57:42 AM
Creation date
7/18/2013 8:57:37 AM
Metadata
Fields
Template:
BOCC
Date
5/5/1997
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
10b
Document Relationships
Minutes - 19970505
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
24 , <br /> Estimated Cost of New Facilities <br /> Includes Tier A and Tier B <br /> Elementary School Capacity = 600 students Square Footage 95,225 <br /> Square Ft.per Student 158.7 <br /> Construction Cost Cost Per Square Foot $ 104 $ 9,903,400 <br /> Site Acquisition Acres: 16 <br /> Average Cost Per Acre: 25,000 $ 400,000 <br /> Site Development As a percentage of Construction Cost 10% $ 990,340 <br /> Fees As a percentage of Construction Costs and Site Development 10% 1,089,374 <br /> Moveable Equipment As a percentage of Construction Cost 5% $ 495,170 <br /> Technology Cost per square foot $ 8.25 $ 785,606 <br /> ('includes cabling and equipment for voice, video and data distribution systems) <br /> Construction Contingency As a percentage of Construction Cost and Site Development 5% $ 544,687 <br /> Start-Up Costs Non Personnel One time start-up costs $ 330,000 <br /> Total $ 14,538,577 <br /> Middle School Capacity = 700 students Square Footage 132,192 <br /> Square Ft.per Student 188.8 <br /> Construction Cost Cost Per Square Foot $ 121 $ 15,995,232 <br /> Site Acquisition Acres: 22 <br /> Average Cost Per Acre 25,000 $ 550,000 <br /> Site Development As a percentage of Construction Cost 10% $ 1,599,523 <br /> Fees As a percentage of Construction Costs and Site Development 10% 1,759,476 <br /> Moveable Equipment As a percentage of Construction Cost 5% $ 799,762 <br /> Technology Cost per square foot $ 8.25 $ 1,090,584 <br /> (includes cabling and equipment for voice, video and data distribution Systems) <br /> Construction Contingency As a percentage of Construction Cost and Site Development 5% $ 879,738 <br /> Start-Up Costs Non Personnel Start Up-one time $ 350,000 <br /> Total $ 23,024,314 <br /> R <br /> 4/7/97 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.