Orange County NC Website
10 <br /> FINDINGS OF THE ORANGE COUNTY PLANNING STAFF <br /> PERTAINING TO Orange Regional Landfill <br /> APPLICATION: Gayle Wilson - Chapel Hill Director of Solid Waste Management <br /> Special Uses must comply with general and specific standards as set forth in Article 8. Article 8.2.1 b) requires written <br /> findings certifying compliance with the following: <br /> (1) Specific regulations governing individual Special Uses as set forth in Article 8.8. These regulations are <br /> divided into two (2) section which include: <br /> (a) Application components; and <br /> (b) Specific standards for Special Uses (Article 8.2.4, Article 8.8.2.1 and 8.8.2.2). <br /> (2) Other requirements as set forth in the Zoning Ordinance, including the provisions of Article 5 <br /> (Dimensional Requirements) and Article 6 (Application of Dimensional Requirements). <br /> Listed below are the findings of the Orange County Planning Department regarding the application in question. The <br /> findings have been presented by Article and requirement to assist the Board of Adjustment in its deliberations. <br /> ARTICLE 8.6 AND 8.8 -APPLICATION COMPONENTS ("Yes" indicates compliance: "No" indicates Non-compliance) <br /> PLANNING <br /> BOARD BOARD OF <br /> RECOMMENDED EVIDENCE SUBMITTED COMMISSIONERS <br /> FINDINGS TO SUPPORT FINDINGS FINDINGS <br /> Ordinance Requirements <br /> 8.6 - Application submitted on forms —x—Yes No A complete application on Yes No <br /> providing full and accurate description appropriate forms has been <br /> of proposed use, including location, submitted. <br /> appearance and operational <br /> characteristics. <br /> 8.8 a) - Twenty Six (26) copies of _x—Yes No Twenty Six (26) copies of the Yes No <br /> the site plan prepared by a registered site plan, prepared by <br /> land surveyor, architect, or engineer. Michael Hining Archtitects <br /> have been submitted. <br /> 8.8 b) - Elevations of all proposed _x_Yes No Elevations are shown on Yes No <br /> structures to be used in the development. the plans. The vehicle <br /> maintenance building <br /> is the only building proposed. <br /> 8.8 c) - A fee, as set by the Board _x—Yes No The application fee has been Yes No <br /> of County Commissioners. paid. <br />