Browse
Search
2013-242 Planning - J F Wilkerson Contracting company for Final adjustment of actual field Installed quantities for Central Efland portion of project $237.810.72
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2013
>
2013-242 Planning - J F Wilkerson Contracting company for Final adjustment of actual field Installed quantities for Central Efland portion of project $237.810.72
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2013 10:10:46 AM
Creation date
7/17/2013 10:00:50 AM
Metadata
Fields
Template:
BOCC
Date
7/17/2013
Document Type
Contract
Agenda Item
Mgr Signed
Document Relationships
R 2013-242 Planning - J F Wilkerson Contracting Company Final adjustment of actual field installed quantities for Central Efland portion of project
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Buckhorn Area North of 1-85 and Efland Sewer System Improvements Project <br /> Orange County, North Carolina <br /> Central Efland Final Adjustment of Installed Quantities <br /> Actual <br /> Item Actual Installed Quantity <br /> Item Qty Unit Bid Bid Total Installed Total Variance <br /> No. Quantity Total Variance <br /> Quantity <br /> 6"DIP Service Connections(Road <br /> 73 Crossings) 50 LF $77.00 $3,850.00 0.00 $ - -50.00 $ (3,850.00) <br /> 74 3/4"Service Taps 10 EA 1 $375.00 $3,750.00 1.00 $ 375.00 -9.00 $ (3,375.00) <br /> 75 Installing 3/4"Copper Water Services 10 EA $680.00 $6,800.00 18.00 $ 12,240.00 8.00 $ 5,440.00 <br /> Installing 3/4"Coppers tubing from <br /> 76 relocated water meter 150 LF $19.50 $2,925.00 30.00 $ 585.00 -120.00 $ (2,340.00) <br /> 77 Constructing 250 GPM Pump Station 1 LS $195,000.00 $195,000.001 100% $ 195,000.00 0.00 $ - <br /> 78 Trench Rock Excavation 100 CY $50.00 $5,000.00 284.01 $ 14,200.50 184.01 $ 9,200.50 <br /> 79 Installing#57 Washed Stone 50 TON $17.00 $850.00 70.51 $ 1,198.67 20.51 $ 348.67 <br /> 80 Installing#67 Washed Stone 50 TON $17.00 $850.00 0.00 $ - -50.00 $ (850.00) <br /> 81 Installing Crusher Run,CABC 200 TON $22.50 $4,500.00 203.78 $ 4,585.05 3.78 $ 85.05 <br /> Asphalt topping at entrance to Access <br /> 82 Drive 1 LS 1 $750.00 $750.00 100% $ 750.00 0.00 $ - <br /> 83 Silt Fence 350 LF $1.72 $602.00 0.00 $ - -350.00 $ (602.00) <br /> Erosion Control Blankets(6.67 feet <br /> 84 wide) 100 LF $3.00 $300.00 0.00 $ - -100.00 $ (300.00) <br /> 85 Rock Check Dams 3 EA $150.00 $450.00 1.00 $ 150.00 -2.00 $ (300.00) <br /> 86 Class B Rip Rap 25 TON $40.00 $1,000.00 0.00 $ - -25.00 $ (1,000.00) <br /> 87 Select Backfill 250 CY $18.00 $4,500.00 250.00 $ 4,500.00 0.00 $ <br /> 88 18"RCP 44 LF $34.00 $1,496.00 34.00 $ 1,156.00 -10.00 $ (340.00) <br /> 89 18"Flared End Inlet 1 EA $590.00 $590.00 1.00 $ 590.00 0.00 $ <br /> 90 18"Flared End Outlet 1 EA $790.00 $790.00 1.00 $ 790.00 0.00 $ - <br /> 91 Class A concrete mis.Masonry 10 CY $350.00 $3,500.00 18.00 $ 6,300.00 8.00 $ 2,800.00 <br /> L 9492 Class B concrete mis.Masonry 10 CY $150.00 $1,500.00 0.00 $ - -10.00 $ (1,500.00) <br /> 93 Fine Grading,Seeding and Mulching 1 LS $7,000.00 $7,000.00 100% $ 7,000.00 0.00 $ <br /> Pump Station Site Clean up 1 LS $1,000.00 $1,000.00 100% $ 1,000.00 0.001 $ <br /> $ 2,291,603.04 $ (237,810.72) <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.