Browse
Search
2013-222 Bid Award – Community Geothermal HVAC – Phase II Agreement Warren Hay Mechanical
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2013
>
2013-222 Bid Award – Community Geothermal HVAC – Phase II Agreement Warren Hay Mechanical
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2013 9:38:39 AM
Creation date
7/17/2013 8:48:20 AM
Metadata
Fields
Template:
BOCC
Date
6/18/2013
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5w
Document Relationships
Agenda - 06-18-2013 - 5w
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2013\Agenda - 06-18-2013 - Regular Mtg.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
[Departmental Use Only] <br /> TITLE GEO-THERMAL SYSTEM, PH II <br /> FY 2013-14 <br /> NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT OVER$1,000,000.00 <br /> ORANGE COUNTY <br /> THIS CONSTRUCTION AGREEMENT(hereinafter called "Agreement"), made as of the 19th day of <br /> June, 2013, by and between Warren-Hay Mechanical, (hereinafter called the "Contractor"), and Orange <br /> County, a body politic and a political subdivision of the State of North Carolina, (hereinafter called the <br /> "Owner"). <br /> WITNESSETH: <br /> That the Contractor and the Owner, for the consideration herein named, agree as follows: <br /> 1. DEFINITIONS <br /> a. Change Order. A written order signed by the Owner authorizing an addition, deletion, or <br /> revision in the Work and/or an adjustment in the Contract Price and/or an adjustment in the <br /> Date of Substantial Completion. <br /> b. Contract Price. Total monies payable to the Contractor pursuant to the Contract Documents. <br /> The Contract Price may only be amended by Change Order. <br /> c. Contract Documents. All of the documents that make up the agreement between the Owner <br /> and Contractor as set out in Section 2. <br /> d. Contract Time. The number of calendar days stated in, or computed from, the Contract <br /> Documents for the completion of the Work, or any portion thereof. Time of completion as <br /> specified therein is of the essence. The time used and referred to on the Project will be that <br /> time which is observed in Hillsborough,North Carolina, being Eastern Daylight Savings Time, <br /> Eastern Standard Time, or other as designated by the Designer or Owner if no Designer is <br /> retained for the Project. <br /> e. Designer. The person or firm designated as the Designer in the Contract Documents, or their <br /> authorized representatives. The Designer, as referred to herein, shall mean architect, landscape <br /> architect, and/or engineer. They will be referred to hereinafter as if each were of the singular <br /> number,masculine gender. <br /> f. Drawings. Designer approved graphic and pictorial portions of the Contract Documents <br /> showing the design, location, and dimensions of the Work and generally including plans, <br /> elevations, sections, details, schedules, and diagrams. <br /> g. Field Order. A written order issued by the Designer which clarifies or interprets the Contract <br /> Documents or orders minor changes in the Work in accordance with the Contract Documents. <br /> h. Final Completion. The point at which the Contractor has, as determined by the Designer, <br /> completed the Work, including punchlist work and the submittal of the Affidavit in section <br /> 8(d), with the exception of guaranty and warranty obligations, and becomes entitled, upon the <br /> recommendation of the Designer and determination by the Owner,to final payment. <br /> Revised November 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.