Orange County NC Website
� Hobbs Upchurch Associates <br /> .NpYfC: <br /> 6nginaering I planning I suer.:,.in v, <br /> Suckhorn-Mebane EDD Phase 2 <br /> Sewer Improvements to serve the Efland Community <br /> Orange County,NC <br /> Pref rninary Cost Estimate <br /> to Quantity Untt Price Extended Cosh <br /> 10-inch SDR 35 Sanitary Sewer 2,300 If $60,00 <br /> $138,000.0__0 <br /> _...__ $ <br /> 10-inch DI Sanitary Sewer <br /> _......_..... _ ry 300 If ._................. $75:00 ._......._----$22,500.00 <br /> 4-foot Diameter Manhole 10 ea $2,750,0.0 $27,500.00 <br /> 8"PVC SDR 21 Forcemain ` 1,400 if_ $18.00 $25,200.00 <br /> 8"CL 250 D1 Forcemain 360 If $35.00 $12,600.00 <br /> 10"PVC SDR 21 Forcemain 6,950 If $22.00 $152,900.00 <br /> .... _._.._...._--- -.__._..__..._..........-. _.......... <br /> 10"CL 250 DI Forcemain 500 ea $50.00 -_� $25,000.00 <br /> 10"ID HDPE Installed by Directional Bore 1,750 If $450.00 $787,500.00 <br /> 16"Steel Casing Installed by Bore 280 If $200,00 - $56,000.00 <br /> 20"Steel Casing Installed by Bore&Jack 380 If _ $250.0_0 _ $95,000.00 <br /> 20"Steel Casing Installed on Grade by Bore& 60 If $3SD.00 F $21,000.00 <br /> Jack <br /> Tie to Existing Forcemain__ 1 Is $3,000.00 $3,000.00 <br /> _._... .._...._.. <br /> Existing Pump Station Modifications 1 Is $75,000.00 $75,000.00 <br /> - -----.._ ..._ .. .. - --- - --- ..�..�...__ -- ---- -- <br /> Duplex Submersible Pump Station -- _ 1 Is $195,000.00 $195,000.00 <br /> Standby E­m_'_e_r_ge`n­'c__V Generator J 1 Is $60,000.00 $60,000.00 <br /> Clearing 2.25 ac $4,000.00 $9,000.00 <br /> Select Fill 1,500 cy -- - $20.00 $30,000.00 <br /> Asphalt open cut&Patch T - _ 240 s lam— -$50.00 $12,000.00 <br /> Concrete Drive Removal&Replacement 25 sal $350.00 $8,750.00 <br /> Seed Mulch&Erosion Control 8.50 ac 1 $3,000.00 $25;500.00 <br /> Total Estimated Construction Cost: $1,781,450.00 <br /> _..........._................-........__....................._.._.._._._.-_ __...... ......._.......--._..._..-.__._... <br /> Construction Contingency: $178,145.00 <br /> Survey: $18,000.00 <br /> .......................:............ <br /> _....__.....___. -------- <br /> Engineering Design: $133,600.00 <br /> Construction Administration&Inspection: $115,800.00 <br /> R/R Encroachment $25,000.00 <br /> -......_._.-._.. _ ..._....._.........._ — ...............-..__......_..._...... <br /> Easement Acquisition $1010W.00 <br /> Permits --- -- ----------- <br /> $2,000.00 <br /> ITotal Estimated Project Cost: $2,263,995.00 <br /> T.910.692.6016 i F:910.892.7342 13008W BROAD STREET I SOUTHERN PINES,NO 20387 I WWW.HOBBSUPCHURCH.COM <br /> SUPERIOR PERFORMANCE THROUGH INNOVATIVE DESIGN <br />